Laserfiche WebLink
02/05/15 AC Minutes <br /> ■ There is still sufficient capacity in apartments and condominiums to support continued <br /> enrollment increases well beyond the next five years. <br /> ➢ The Town hired Symmes, Maini, &McKee Associates (SMMA) to evaluate the capacity <br /> of the current school buildings and to provide concepts for addressing space shortages <br /> based on current and projected enrollment. SMMA also explored options for addressing <br /> current space shortages on a short-term basis. The findings included the following: <br /> • Eight of the nine elementary and middle schools are currently at or over capacity. <br /> • The pre-kindergarten program has outgrown its space in Harrington Elementary <br /> School. Space in the School Administration Building is being used, but this is not a <br /> satisfactory long-term solution. The program is governed by state regulations that are <br /> not flexible. The Town is obligated to provide a pre-K program only for children with <br /> special needs; however, the state will not approve a Town-operated program unless <br /> non-special-needs children are also admitted. Without adequate space for a combined <br /> special needs and non-special needs program, the special education students in the pre- <br /> kindergarten program would have to be sent to out-of-district programs, an expensive <br /> alternative and one that makes no sense for children less than five years old. <br /> • Schools need additional space to allow for enrollment fluctuations and fluctuations in <br /> the number of students per grade that need to be accommodated. <br /> • Schools need core space in addition to classrooms that is enrollment-dependent. The <br /> cafeteria, gymnasium, art room, music room, library, nurses' facilities, etc. must be <br /> able to support the student population in a school. Enrollments at the Bridge and <br /> Bowman schools are proposed to be reduced to "right-size" these schools. <br /> • SMMA used the Massachusetts School Building Authority criteria for determining the <br /> appropriate size for classrooms and core space. These criteria have changed over the <br /> years to accommodate additional space needs resulting from the use of technology in <br /> the classroom and the increased use of one-on-one or small group teaching methods. <br /> Many rooms are currently inadequate under these standards. <br /> Ideas were suggested and questions were asked by this Committee; Dr. Ash and Ms. Coppe <br /> responded, sharing information about all the avenues that had been explored and adding <br /> details that illustrated the complexity of a multi-dimensional problem. Ms. Coppe noted that <br /> redistricting will be part of the solution, and parents are being prepared for this. <br /> There was discussion about the funding associated with adding space to school buildings. Dr. <br /> Ash shared a handout that identifies a possible funding approach that includes a spring 2015 <br /> appropriation of$4,080,000 to fund further studies, schematic-level design, design <br /> development, construction documents, and bidding—with the level of work tailored to each of <br /> the schools involved and the projected timelines to bring on the additional capacity at each <br /> school. The concept is to retain flexibility as more information is gained about the costs and <br /> timing of the various capital-improvement components being considered but to have funds <br /> available to pursue the most pressing needs in an efficient and timely approach. <br /> Mr. Levine expressed his concern about the amount of money being requested for school <br /> projects. Attempting to address the need for new municipal buildings, new school buildings, <br /> and other school projects in a relatively short time, as set forth in the funding model created <br /> by Carl Valente, Town Manager, and Mr. Addelson, could result in an unacceptable tax <br /> burden that may not be supported by Lexington's taxpayers. He supports the work that was <br /> 3 <br />