Laserfiche WebLink
9/23/14Minutes <br />Liaison Reports: <br />3. <br />Ad hoc School Master Planning Committee (AhSMPC):Mr. Levine reported that he reviewed <br />thetwo reports that were presented to the School Committee last week: one from theEnrollment <br />Working Group (working group)and one from Symmes, Maini, and McKee Associates (SMMA), <br />consultants for the school master planning project. Mr. Levinedeveloped school enrollment <br />projections that suggest an increase of approximately 600 students between now and 2019, whereas <br />the working group projects 672 new students.In either case, the increases need to be addressed. <br />Mr.Levineaddedthat Clarke Middle School will need additional space in three to four years, but the <br />immediate demandis at the elementary level in 2015-2016. Although Estabrook Elementary School <br />(Estabrook) has four extra classrooms,the other five elementary schools are currently at or exceeding <br />capacity, andthe anticipated student increases in 2015-2016create a situation that challenges <br />Lexington’s educationalpolicies.Redistricting alone will not resolve the problem.The SMMA report <br />suggests using general classroom space for art and music programs until a long term solution is <br />implemented at the elementary level, but the School Committee has traditionally expressed strong <br />supportforseparate art andmusic rooms. <br />Mr. Levine concluded his report by saying that the Ad hoc School Master Planning Committee has <br />asked SMMA to provide costs and pros and cons for addressing the 2015-2016 elementary school <br />capacity needs by adding modular classrooms and/or by moving pre-kindergarten students from the <br />Harrington Elementary School into the School Administration Building. The latter is complicated <br />because, althoughthe School Administration Buildinghas some available space, the building will <br />need to be upgraded to meet currentschool building codes. <br />Water/Sewer Rates:Mr. Bartenstein reported that the BoS had recently set the Town’s Water <br />and Sewer rates for FY2015, and that there would be a 2% increase in combined water/sewer rates for <br />the average consumer. He hopes that,in the future, the BoSwill consider his suggestions with respect <br />to the water usage projections that are used to determine the rate changesand the management of <br />surplus revenue. <br />Next Meetings: <br />4.Mr. Parker will arrange for meeting space on October 22 and October 29. <br />The meeting was adjourned at 9:00 p.m. <br />The documentsused at the meeting arelistedbelow. <br />Respectfully submitted, <br />Sara Arnold <br />Recording Secretary <br />Approved November 20, 2014 <br />Exhibits <br />1.Agenda,posted by Glenn Parker, Chair <br />3 <br />