Laserfiche WebLink
We requested that the main entrance be made accessible and we do not support the <br />part of the request for variance pertinent to the entry path. The plans entail taking <br />over the vacant space next door so there are many ways to make sure there is a <br />main accessible and safe entry. The Town Building Commissioner Fred Lonardo <br />is aware of our concerns. <br /> The second request for relief concerns the bathrooms. The site currently has <br />one handicapped bathroom and one ladies’ room on the accessible first floor, but <br />the only men’s room is downstairs. The restaurant tenant wants to have this pass <br />through as an elevator installation would be a hardship and he believes there is no <br />room for a second HP bathroom. The Commission discussed with Mr. Erickson <br />ways to make room for a second HP bathroom, which we would see as ideal, but <br />we could agree to back this request if there are no alternatives. <br /> Please feel free to contact me by email or by cell phone if you have any <br />questions. Thank you for your consideration in this manner. <br />Sincerely, <br /> Victoria Buckley, Chair <br /> Cell phone 617-997-5472 <br />cc by email: Owner James Manganello <br /> Building Commissioner Fred Lonardo <br /> Blaise LaPorta, Bechtel Frank Erickson Architects <br />