Laserfiche WebLink
Motion made by Ms. Miller and seconded by Mr. Wolk to issue an Order of <br />Conditions for Concord Avenue between Spring St and Waltham St, DEP# 201- <br />930, BL 890, 4-0 in favor. Mr. Langseth cannot vote due to not being present at <br />the last meeting. <br /> <br />7:00 pm Meeting – Off Marrett Road within Dunback Meadow Conservation Area, RDA <br /> DET# 14-16 <br /> Applicant: Eric Michelson <br /> Smith Memorial bench installation within the 100-foot Buffer Zone <br /> Present for the Applicant: Eric Michelson, Applicant <br /> <br /> Mr. Michelson proposed the mowing of an area in Dunback Meadow for <br />installation of the Smith Memorial bench. The area near the community gardens <br />located in Dunback Meadow would be avoided during construction activities. <br />Mr. Michelson outlined the area that will be mowed on a map presented to the <br />Commission. It will be approximately 60’ x 60’ x 60’ at the location where the <br />Allen Street path and Clematis Road path meet. Mr. Michelson explained the <br />structure as a round, dry-stone wall with a foundation underneath. The <br />foundation will be dug by a small bobcat. Mr. Michelson proposed hay bales for <br />the erosion control. <br /> <br /> Comments from the Commission as follows: <br />Mr. Langseth asked if the path is wide enough for the bobcat to get to the <br />location and stated he would like to see the clippings left in the area after <br />mowing. Mr. Langseth asked for a clarification on the concrete caps. Mr. <br />Michelson explained that the caps are fieldstones cemented together. Mr. Wolk <br />asked the Commission if the clippings would affect the area with invasive species <br />surrounding. Ms. Mullins stated a pre-construction meeting is required before <br />work can start and erosion controls can be established during that time. Mr. <br />Michelson commented that an F150 would also be used for equipment. <br /> <br /> Motion made by Mr. Wolk and seconded by Ms. Miller to issue a negative <br />determination with conditions, 5-0 in favor. <br /> <br />7:15 pm Cont. Meeting – 7 Coach Road, RDA <br /> DET# 14-15 <br /> Applicant: Eyal Ron & Mary Rose Scozzafava <br /> Sunroom construction activities and landscape improvements within the 100-foot <br />Buffer Zone <br /> Present for the Applicant: Ginna Johnson, Esker Company Landscape <br />Architecture and Mary Rose Scozzafava, Homeowner <br /> <br />Ms. Johnson explained that the proposed project includes construction of an <br />addition, a bluestone terrace, and landscape improvements. Ms. Johnson <br />submitted revised drainage calculations showing a different soil type. The limit <br />of work line and erosion controls are shown on the plan along the buffer zone. <br />Ms. Johnson described a 12’ wide access area. <br /> <br /> <br /> <br /> <br /> <br />