Laserfiche WebLink
a representative to attend a Conservation Commission meeting to explain the <br />treatments in more detail. Ms. Miller suggested set up of a special meeting. <br /> <br /> The Commission postponed approving the minutes from July 31, 2014. <br /> <br />7:00 pm Hearing – 46 Ledgelawn Avenue, NOI <br /> DEP# 201-946, BL 904 <br /> Applicant: Zhiqiang Han & Jing Wang <br />Raze and rebuild a single-family dwelling and associate utilities and <br />infrastructure works within the 200-foot Riverfront Area <br />Present for the Applicant: Mark Giarrusso, Hybrid Built Home, Azu Etoniru, <br />E.T. Engineering Enterprises, Inc., and Jing Wang, Homeowner/Applicant <br /> <br />Mr. Giarrusso explained the site and proposed work to raze and rebuild a single- <br />family dwelling. <br /> <br /> Comments from the Commission as follows: <br />Ms. Miller read the engineering review stating, “This project is demolition and <br />replacement of a single-family dwelling. The project limits cross into the 200 <br />foot river front zone of North Lexington Brook. Storm water is proposed to <br />managed with three infiltration structures. The soils assumptions are based on <br />the Conservation Service Survey. Infiltration tests and soils reports were not <br />submitted. The design appears to be responsive. The estimated high water table <br />was not determined. The distance between the infiltration structure and the water <br />table is not known. It would be feasible to do soils investigations at the time of <br />construction for this scale of project. The installation should be reviewed by a <br />licensed professional and as-built drawings should be on file. During <br />construction, erosion and sedimentation control procedures should be in place. <br />This should include a wheel-cleaning area for construction vehicles.” Mr. <br />Hamilton commented that no test pits were done. Mr. Bitsko asked if an <br />operations and maintenance plan was submitted and stated that test pits need to <br />be done before the hearing is closed. Ms. Miller requested test pits to be done <br />near the infiltration systems and backup data submitted. <br /> <br />Albert Childress of 33 Liberty Avenue voiced concerns regarding the water table <br />in the area. <br /> <br />Motion made and seconded to continue the hearing to September 8, 2014 at 7:00 <br />pm at the request of the applicant, 4-0 in favor. <br /> <br />7:34 pm Motion made and seconded to adjourn the meeting, 4-0 in favor. <br /> <br />Respectfully submitted, <br /> <br />Michelle Morelli <br />Community Development Department Assistant <br />