Laserfiche WebLink
Lexington Permanent Building Committee 3-14-13 <br />4.0 Bridge & Bowman Renovation Projects <br />4.38 Contract review <br />9/13/12 <br />General discussion with Town Counsel on rights and remedies in TLT contract. <br />Counsel reviewed all the letters and notices sent to TLT and did not have concern over the type and time of notice as it was given to <br />TLT. However DPF did note that a copy of the letters did go to TLT in certified mail. <br />Discussion on claim to TLT for owner costs to perform numerous tasks that were required for school use of both Phase 2 and Phase <br />1 . Letters outlining these claims or costs have been sent to TLT and to Counsel. PBC was notified of the issues and work <br />performed. Expenses categorized as take over of work, clean up and corrections. <br />Discussion on assessment of Liquidated Damages per spec requirements at $2,500 per day. Letters sent to TLT and to counsel, PBC <br />advised. <br />Claims are submitted as a CCD and Kevin is comfortable with this method. <br />TLT has been advised that the town requires a full project schedule, a recovery schedule, certified payrolls in place and a release of <br />liens from subs on payments made <br />Counsel defined contract options with TLT are as follows: <br />1. Continue with TLT <br />2. Terminate for convenience <br />3. Terminate for Cause <br />4. Negotiate with Surety on take over or management oversight. <br />However discussion suggested that these decisions should be tabled. Primary importance right now is meeting 10/15 deadline for <br />heat. <br />4.41 Schedule and Contract <br />11-8-12 <br />Discussion on moving forward with project raised past discussions on contract option discussions with Town Counsel. Parties <br />concerned over moving forward with confidence. <br />PBC asked for discussion with Daedalus Projects for evaluation of project schedule and Options on carrying forward with TLT. <br />Two tasks requested. <br />1. Explore options on contract completion and how each path (termination for cause, termination for convenience, contact <br />bonding company, etc.) would effect project completion, path, schedule, costs, and overall impact to project. <br />2. Examine project schedule (Construction & recovery) from TLT and evaluate the soundness / logic of the schedule, cash <br />flow, and other aspects to be sure what is proposed is sound. <br />Motion to empower Facilities to request proposal, up to $20,000 and to engage Daedalus to perform an evaluation of the proposed <br />project schedule , cash flow, and contract options with TLT for the Bridge & Bowman Project. <br />Motion : Jon 2: Eric Vote: 8-0 <br />nd <br /> <br /> <br />4.43 Discussion with Daedalus on GC Contract <br />12/13/12 <br />Bob White from Daedalus projects led a discussion on the processes and impact of termination of a construction contract. <br />Termination for cause: <br />Can be a very difficult process. Town counsel will need time to review all of the materials and facts before giving advice on <br />whether or not to proceed. Most likely avenue would be failure to administer or to provide skilled labor or materials. Legal <br />costs would likely be very high. B <br />brought in same GC for completion. Bonding company could take 3-6 months to evaluate. Summer 2013 work likely canceled. <br />Termination for convenience: <br />Project would be audited and the town would buy out oh&p from GC. Daedalus estimates approx. $700,000 payment to GC <br />plus cost to re-engineer project and re-bid. There would likely be a premium added by the new GC. Summer 2013 work likely <br />canceled. Overall added costs could easily exceed $1 to 1.5 million. <br />Continuation of Contract with GC: <br />Bob talked with GC and met with the Owners, they want to turn project around. Best advice from Daedalus is work with GC <br />and find a way to make the project better. <br />Brief discussion on expansion of Daedalus services. <br />Daedalus is already on board to review new schedule when it comes out from TLT, and provide feedback on schedule and <br />viability. Any expansion of Daedalus Services can be addressed after schedule review. <br />2/14/13 <br /> Page 2 of 6 <br /> <br />