|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2009 ATM AG BYLAW Approval
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Attorney General Approvals
>
2000-2009
>
2009
>
2009 ATM AG BYLAW Approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2023 3:58:55 PM
Creation date
7/30/2014 2:47:49 PM
Metadata
Fields
Template:
Archives
Year
2009
Author or Source
Town Clerk
Keywords or Subject
Attorney General Approval 2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) The Planning Board in its regulations shall establish standards for <br /> special permit approval consistent with §135-12B. <br /> D. Procedures for Site Plan Review. <br /> (1) Applicants shall submit an application for site plan review to the <br /> Planning Board. <br /> (2) The Planning Board shall promulgate, after public notice and hearing, <br /> rules and regulations to effectuate the purposes and intent of this <br /> provision of the by-law, including definitions of major and minor site <br /> plans and delegating administrative review to the Board's designee that <br /> will allow site plan review without a public meeting for site plans that <br /> are defined as minor. <br /> (3) A public meeting shall be required for all major site plans. The meeting <br /> will be advertised in the local newspaper once in each of two successive <br /> weeks prior to the meeting and a notice will be sent to landowners <br /> within 300 feet of the affected lot. <br /> Procedures (4) The Planning Board or its designee shall review and act upon the site <br /> plan, requiring such conditions as necessary to satisfy the Review <br /> Standards, and notify the applicant of its decision. The decision shall be <br /> in writing and shall be rendered within 60 days of the date of <br /> application. <br /> (5) The applicant may request, and the Planning Board may grant by <br /> majority vote, an extension of the time limits set forth herein. <br /> (6) The applicant shall satisfy or comply with all conditions of the site plan <br /> review decision prior to the issuance of a building permit except for <br /> those conditions that by their terns are intended to be satisfied during <br /> construction or later. <br /> (7) Unless specifically authorized by the terms of the site plan review <br /> decision, a final certificate of occupancy shall not be issued until the <br /> applicant has complied with or satisfied all conditions of the site plan <br /> review decision. <br /> E. Review Standards. The PIanning Board in its regulations shall establish <br /> standards for site plan review that will at a minimum address the following: <br /> (1) Siting of facilities <br /> (2) Design practices <br /> (3) Open space and natural features <br /> (4) Circulation <br /> Standards for site plan (5) Water quality <br /> review (6) Town character and historic significance <br /> (7) Impacts on public services and facilities <br /> (8) Signage <br /> (9) Safety <br /> TRUE COPY A''I'EST (10) Energy efficient site design <br /> h ' <br /> (11) Potential adverse effects <br /> TOWN CLERK <br /> LEXINGTON,MA <br />
The URL can be used to link to this page
Your browser does not support the video tag.