Laserfiche WebLink
, <br />j <br />V <br />W p <br />Vv C� <br />R N <br />GtM O 600 1200 �GpO <br />SCALE A 'EET <br />W I N C H E <br />S <br />T E <br />tr <br />hA7c / 6X 1S7*, <br />0 i;'GLEAN 6'i/Z4(/6L <br />z <br />REVIS10NS <br />NO. DATE I DRAWN BY DESCRIPTION <br />Q 4 - ?7 -87 P ✓F n,6Q.E. COMWCAITS <br />I GENERAL NOTES <br />I. PLANS AND PROFILES OF THE GROUND SURFACE ARE BASED UPON EXISTING SEWER <br />RECORD PLANS OR CONTRACT DRAWINGS AND MAY NOT REFLECT CURRENT GROUND <br />CONDITIONS. <br />2. DUE TO THE NATURE OF THIS PROJECT, ALL ELEVATIONS ARE BASED ON DATUMS <br />FROM EXISTING RECORD PLANS OR CONTRACT DRAWINGS AND SHOULD NOT BE ASSUMED <br />TO REFER TO A USGS MEAN SEA LEVEL DATUM, NOR SHOULD IT BE ASSUMED THAT <br />THERE IS A RELATION AMONG'THE DIFFERENT DATUMS. <br />3. THE SEWER STATIONING WAS TAKEN FROM TOWN RECORDS AND THEREFORE STA, -.0 +00 <br />MAY NOT BE ON EVERY DRAWING. <br />4. FOR POINT REPAIRS ON SEWERS, THE DRAWINGS SHOW THE APPROXIMATE BEGIN14ING <br />OF THE POINT REPAIR AND THE LENGTH OF PIPE TO BE REPLACED, IF THE DISTANCES <br />SHOWN DO NOT CORRESPOND EXACTLY TO PIPE JOINTS, THE CONTRACTOR SHALL BEGIN <br />AND END POINT REPAIRS AT PIPE JOINTS. <br />5. EACH PROJECT SITE IS IDENTIFIED BY A SITE NUMBER WHICH CORRESPONDS TO THE <br />SITE 5_EMBERS IN SECTION 201.1 "SCHEDULE OF WORK” OF THE SPECIFICATIONS. <br />ADDITIONAL INFORMATION ABOUT THE PROJECT SITES IS PROVIDED IN THE "DETAILS <br />AND GENERAL NOTES" APPENDED TO THE SPECS. OR CAN BE OBTAINED AT THE OFFICES <br />OF LEA GROUP ENGINEERS. <br />6. SEPARATE CONSTRUCTION SPECIFICATIONS ARE INCLUDED WITH THE CONTRACT DOCUMENTS. <br />THESE STANDARD CONTRACT DRAWINGS ARE NOT COMPLETE WITHOUT THESE SPECIFICATIONS. <br />7. SINCE MOST OF THE WORK WILL BE IN PREVIOUSLY EXCAVATED TRENCHES, NO BORINGS <br />WERE TAKEN. KNOWN SUBSURFACE CONDITIONS ARE INDICATED ON THESE DRAWINGS. <br />8. THE CONTRACTOR SHALL CONFINE HIS OPERATIONS AND ACTIVITIES FOR CONSTRUCTION <br />PURPOSES WITHIN STREET LINES, EASEMENTS, AND RIGHTS OF WAY AS SHOWN ON THE <br />DRAWINGS. TRENCHES FOR THE REPLACEMENT OF SEWER SERVICES SHALL PROCEED ONLY <br />AS FAR ACROSS PRIVATE PROPERTY AS DIRECTED BY THE ENGINEER. CONSTRUCTION <br />OPERATIONS SHALL BE CONDUCTED SUCH THAT, WHERE POSSIBLE, ONE LANE OF TRAFFIC <br />REMAINS OPEN AT ALL TIMES ON TRAVELLED WAYS. THE CONTRACTOR SHALL COORDINATE <br />CONSTRUCTION, TRAFFIC CONTROL, AND DETOURS WITH THE LEXINGTON POLICE AND FIRE <br />DEPARTMENTS TO MINIMIZE OBSTRUCTION OF TRAFFIC, ALL SUITABLE EXCAVATED <br />MATERIAL IN STREETS SHALL BE HAULED AWAY AND STORED IN AREAS AS DIRECTED B <br />THE ENGINEER UNTIL IT CAN BE USED FOR BACKFILL, SHOULD IT BECOME NECESSARY <br />TO CLOSE THE ROADWAY TO THROUGH TRAFFIC, THE CONTRACTOR SHALL GIVE AT LEAST <br />ONE (1) WEEK NOTICE TO THE ENGINEER, SO THAT AN ALTERNATE THROUGH ROUTE CAN <br />BE ESTABLISHED. THE CONTRACTOR SHALL PROVIDE DETOUR SIGNS ALONG THE <br />ALTERNATE THROUGH ROUTE, AS DIRECTED BY THE ENGINEER. <br />9. THE CONTRACTOR SHALL NOTE THAT THERE MAY BE CONFLICTS WITH EXISTING GAS <br />AND UNDERGROUND ELECTRIC POWER LINES, AND THAT HE SHALL COORDINATE ALL <br />WORK WITH THE APPROPRIATE UTILITY, <br />10. DAMAGE TO ANY UTILITY WILL BE REPAIRED BY THE CONTRACTOR, AT THE CONTPACTOR'S <br />EXPENSE, IN A TIMELY MANNER SO THAT DISRUPTION OF SERVICE OF ANY UTILITY <br />WILL NOT BE LONGER THAN TWO HOURS OR PRACTICALLY NECESSARY TO REPAIR THE <br />DAMAGE. THE CONTRACTOR SHALL COORDINATE REPAIR WORK WITH THE APPROPRIATE <br />UTILITY COMPANY OR THE TOWN, <br />11. REPLACEMENT SEWER IS TO BE OF PVC WHEREVER POSSIBLE, AS DIRECTED BY THE <br />ENGINEER, AND CONNECTED TO THE EXISTING SDIER WITH FITTINGS OR PZAPTERS AS <br />APPROVED BY THE ENGINEER. <br />r <br />12. SPECIAL CONSIDERATION SHOULD BE GIVEN TO SITES NUMEER `21, ZZ, -93,25, ZS A'�9zp <br />WHERE EXCAVATION WORK WILL BE DONE IN WETLAND AREAS. SPEC AL REQU _EMF,'"TS <br />PERTAINING TO WORK IN THESE AREAS ARE LISTED IN THE SPECIFICATIONS. <br />13. CONSTRUCTION DETAILS ARE APPENDED TO THE SPECIFICATIONS. <br />14. LOCATIONS AND EXTENT OF POINT REPAIRS ON SEWED SERVICES S11-NIJ2 BE DETERMINED <br />IN THE FIELD BY THE ENGINEER. <br />PAVEMENT REPLACEMENT DETAILS <br />y. <br />Gp ✓h'SB <br />/% Ci /NOER <br />cou/tSE <br />SIDEWALK <br />NO SCALE <br />UVL)15TU1?3E0 PAVEMENT(TY)F <br />—T <br />"MEC14A N /CALL Y <br />COMPACTED <br />Gri'4 YEL - Co "L /FTS <br />TIFENC H <br />,s4wcur <br />TOWN STREETS <br />NO SCALE <br />(TYP 6" PC - "I ICED <br />3177 co,vc, co vc, <br />TEMj? °aTCH <br />T1745-NCH <br />Y S `SEC. ) <br />s �,if� ✓GEC? GO�/.lsF� <br />3 `c E� °SE M?X <br />'617T` ol"' oU5 c©uc <br />(lip "YOAcoa /it 6 <br />,(1 %2` /31NL7E ) <br />A5 ?tC7E F3YM:D.C?W. <br />FA I UH STATE HiSt WAVY <br />NO SCALE <br />TON OF LEXINGTON, t4VzS! ' *jST-?"T5 <br />S!---VIER SYSTLM R' _ ABII FrATiQ- <br />DATE OPAL "P BY h LRI n t <br />SEPT. 1985 TA'i 5/?1e, . - _. �.:i:S`,d.: -..� .a±c:rct•; = or?ac.:: -,.. A; <br />GROUP 75 Kneeland Street, 91o,;�4 t= n. Y ., O2111 <br />PRAO�TCT NO. <br />59EJ0 <br />R1 <br />h <br />t Q <br />-t <br />3 <br />a <br />t <br />� r <br />\ MAARCTi ST NARRETi <br />C. ACCESS flD. <br />'�E. <br />�T <br />1z V <br />pgi <br />SSflp / SSo <br />r <br />LEGEND <br />PIPE DIAMETER (8" It';LUS DTVF,' rj, zE NOTED) <br />DIM TION OF FIr?W <br />"OLE At <br />DISTiKICT DQMXRY AIM DIZfRICT 1i ;UKBER <br />i� <br />EXC4VA` E ACS' : Ph'XS?CkT— PrAA.3' ZLTiT.A`1'ION <br />ARE V %"VA.L Nrl0 5, Tva S S1. tz"r <br />08,7 <br />A v .TICN <br />F g� <br />T5. <br />>v xP -5 z ,Tvis SHEET) <br />�� EPt I UN yES1 A (1$,T1-MTz # W FEET.` TO DE <br />RXpjAc$D IIIDICATE1j <br />W <br />YT°N'I <br />�F- ° ,- ,z=YIO CN W. SIDE P? P_II'E <br />f Y-N)- <br />f <br />S , <br />St?II'a'H ZD :`.,1," ?11,E <br />E4T Iv, ^�P ;FT1'E <br />eta' <br />— — - — <br />TZX <br />6 w <br />--,sm <br />Tc <br />4 „G. <br />x <br />S T <br />A-1 <br />TIB, <br />1 i <br />f <br />�._; <br />V <br />W p <br />Vv C� <br />R N <br />GtM O 600 1200 �GpO <br />SCALE A 'EET <br />W I N C H E <br />S <br />T E <br />tr <br />hA7c / 6X 1S7*, <br />0 i;'GLEAN 6'i/Z4(/6L <br />z <br />REVIS10NS <br />NO. DATE I DRAWN BY DESCRIPTION <br />Q 4 - ?7 -87 P ✓F n,6Q.E. COMWCAITS <br />I GENERAL NOTES <br />I. PLANS AND PROFILES OF THE GROUND SURFACE ARE BASED UPON EXISTING SEWER <br />RECORD PLANS OR CONTRACT DRAWINGS AND MAY NOT REFLECT CURRENT GROUND <br />CONDITIONS. <br />2. DUE TO THE NATURE OF THIS PROJECT, ALL ELEVATIONS ARE BASED ON DATUMS <br />FROM EXISTING RECORD PLANS OR CONTRACT DRAWINGS AND SHOULD NOT BE ASSUMED <br />TO REFER TO A USGS MEAN SEA LEVEL DATUM, NOR SHOULD IT BE ASSUMED THAT <br />THERE IS A RELATION AMONG'THE DIFFERENT DATUMS. <br />3. THE SEWER STATIONING WAS TAKEN FROM TOWN RECORDS AND THEREFORE STA, -.0 +00 <br />MAY NOT BE ON EVERY DRAWING. <br />4. FOR POINT REPAIRS ON SEWERS, THE DRAWINGS SHOW THE APPROXIMATE BEGIN14ING <br />OF THE POINT REPAIR AND THE LENGTH OF PIPE TO BE REPLACED, IF THE DISTANCES <br />SHOWN DO NOT CORRESPOND EXACTLY TO PIPE JOINTS, THE CONTRACTOR SHALL BEGIN <br />AND END POINT REPAIRS AT PIPE JOINTS. <br />5. EACH PROJECT SITE IS IDENTIFIED BY A SITE NUMBER WHICH CORRESPONDS TO THE <br />SITE 5_EMBERS IN SECTION 201.1 "SCHEDULE OF WORK” OF THE SPECIFICATIONS. <br />ADDITIONAL INFORMATION ABOUT THE PROJECT SITES IS PROVIDED IN THE "DETAILS <br />AND GENERAL NOTES" APPENDED TO THE SPECS. OR CAN BE OBTAINED AT THE OFFICES <br />OF LEA GROUP ENGINEERS. <br />6. SEPARATE CONSTRUCTION SPECIFICATIONS ARE INCLUDED WITH THE CONTRACT DOCUMENTS. <br />THESE STANDARD CONTRACT DRAWINGS ARE NOT COMPLETE WITHOUT THESE SPECIFICATIONS. <br />7. SINCE MOST OF THE WORK WILL BE IN PREVIOUSLY EXCAVATED TRENCHES, NO BORINGS <br />WERE TAKEN. KNOWN SUBSURFACE CONDITIONS ARE INDICATED ON THESE DRAWINGS. <br />8. THE CONTRACTOR SHALL CONFINE HIS OPERATIONS AND ACTIVITIES FOR CONSTRUCTION <br />PURPOSES WITHIN STREET LINES, EASEMENTS, AND RIGHTS OF WAY AS SHOWN ON THE <br />DRAWINGS. TRENCHES FOR THE REPLACEMENT OF SEWER SERVICES SHALL PROCEED ONLY <br />AS FAR ACROSS PRIVATE PROPERTY AS DIRECTED BY THE ENGINEER. CONSTRUCTION <br />OPERATIONS SHALL BE CONDUCTED SUCH THAT, WHERE POSSIBLE, ONE LANE OF TRAFFIC <br />REMAINS OPEN AT ALL TIMES ON TRAVELLED WAYS. THE CONTRACTOR SHALL COORDINATE <br />CONSTRUCTION, TRAFFIC CONTROL, AND DETOURS WITH THE LEXINGTON POLICE AND FIRE <br />DEPARTMENTS TO MINIMIZE OBSTRUCTION OF TRAFFIC, ALL SUITABLE EXCAVATED <br />MATERIAL IN STREETS SHALL BE HAULED AWAY AND STORED IN AREAS AS DIRECTED B <br />THE ENGINEER UNTIL IT CAN BE USED FOR BACKFILL, SHOULD IT BECOME NECESSARY <br />TO CLOSE THE ROADWAY TO THROUGH TRAFFIC, THE CONTRACTOR SHALL GIVE AT LEAST <br />ONE (1) WEEK NOTICE TO THE ENGINEER, SO THAT AN ALTERNATE THROUGH ROUTE CAN <br />BE ESTABLISHED. THE CONTRACTOR SHALL PROVIDE DETOUR SIGNS ALONG THE <br />ALTERNATE THROUGH ROUTE, AS DIRECTED BY THE ENGINEER. <br />9. THE CONTRACTOR SHALL NOTE THAT THERE MAY BE CONFLICTS WITH EXISTING GAS <br />AND UNDERGROUND ELECTRIC POWER LINES, AND THAT HE SHALL COORDINATE ALL <br />WORK WITH THE APPROPRIATE UTILITY, <br />10. DAMAGE TO ANY UTILITY WILL BE REPAIRED BY THE CONTRACTOR, AT THE CONTPACTOR'S <br />EXPENSE, IN A TIMELY MANNER SO THAT DISRUPTION OF SERVICE OF ANY UTILITY <br />WILL NOT BE LONGER THAN TWO HOURS OR PRACTICALLY NECESSARY TO REPAIR THE <br />DAMAGE. THE CONTRACTOR SHALL COORDINATE REPAIR WORK WITH THE APPROPRIATE <br />UTILITY COMPANY OR THE TOWN, <br />11. REPLACEMENT SEWER IS TO BE OF PVC WHEREVER POSSIBLE, AS DIRECTED BY THE <br />ENGINEER, AND CONNECTED TO THE EXISTING SDIER WITH FITTINGS OR PZAPTERS AS <br />APPROVED BY THE ENGINEER. <br />r <br />12. SPECIAL CONSIDERATION SHOULD BE GIVEN TO SITES NUMEER `21, ZZ, -93,25, ZS A'�9zp <br />WHERE EXCAVATION WORK WILL BE DONE IN WETLAND AREAS. SPEC AL REQU _EMF,'"TS <br />PERTAINING TO WORK IN THESE AREAS ARE LISTED IN THE SPECIFICATIONS. <br />13. CONSTRUCTION DETAILS ARE APPENDED TO THE SPECIFICATIONS. <br />14. LOCATIONS AND EXTENT OF POINT REPAIRS ON SEWED SERVICES S11-NIJ2 BE DETERMINED <br />IN THE FIELD BY THE ENGINEER. <br />PAVEMENT REPLACEMENT DETAILS <br />y. <br />Gp ✓h'SB <br />/% Ci /NOER <br />cou/tSE <br />SIDEWALK <br />NO SCALE <br />UVL)15TU1?3E0 PAVEMENT(TY)F <br />—T <br />"MEC14A N /CALL Y <br />COMPACTED <br />Gri'4 YEL - Co "L /FTS <br />TIFENC H <br />,s4wcur <br />TOWN STREETS <br />NO SCALE <br />(TYP 6" PC - "I ICED <br />3177 co,vc, co vc, <br />TEMj? °aTCH <br />T1745-NCH <br />Y S `SEC. ) <br />s �,if� ✓GEC? GO�/.lsF� <br />3 `c E� °SE M?X <br />'617T` ol"' oU5 c©uc <br />(lip "YOAcoa /it 6 <br />,(1 %2` /31NL7E ) <br />A5 ?tC7E F3YM:D.C?W. <br />FA I UH STATE HiSt WAVY <br />NO SCALE <br />TON OF LEXINGTON, t4VzS! ' *jST-?"T5 <br />S!---VIER SYSTLM R' _ ABII FrATiQ- <br />DATE OPAL "P BY h LRI n t <br />SEPT. 1985 TA'i 5/?1e, . - _. �.:i:S`,d.: -..� .a±c:rct•; = or?ac.:: -,.. A; <br />GROUP 75 Kneeland Street, 91o,;�4 t= n. Y ., O2111 <br />PRAO�TCT NO. <br />59EJ0 <br />R1 <br />