Laserfiche WebLink
LEGEND <br />CONTOURS <br />SPOT ELEVATIONS <br />STONE WALL <br />GUY POLE <br />TELEPHONE POLE <br />POWER BOX <br />PROPERTY LINE <br />STORM DRAIN <br />WATER MAIN LINE <br />SANITARY SEWER LINE <br />FIRE HYDRANT LOCATION <br />SANITARY SEWER MANHOLE <br />DRAINAGE MANHOLE <br />CATCH BASIN <br />WATER MAIN M.H. <br />IRON PIPE <br />BOUND <br />TEST PIT <br />GUIDE RAIL <br />GAS MAIN <br />EASEMENT LINE <br />VERTICAL GRANITE CURB <br />BITUMINOUS CURB <br />12" DRAIN <br />8" W <br />8" SEWER <br />G <br />VGC <br />BCC <br />DATE: <br />APPLICATION, FILED: <br />HEARING DATE: <br />PLAN APPROVED: <br />r_ MAN <br />LEXINGTON, <br />�I <br />0 <br />1, <br />-,GENERAL MOTES: <br />1) ALL CONSTRUCTION SHALL CONFORM TO THE MASSACHUSETTS HIGHWAY DEPARTMENT STANDARD <br />SPECIFICATIONS FOR HIGHWAY AND BRIDGES, 1988, AND THE TOWN OF LEXINGTON SUBDIVISION CONSTRUCTION <br />STANDARDS. <br />2.) ELEVATIONS ON THIS PLAN ARE BASED ON THE PLAN ENTITLED "JONAS CLARKE JUNIOR HIGH SCHOOL, <br />LEXINGTON MA, EXISTING CONDITIONS" DATED JULY 24, 1997, PREPARED BY HANCOCK SURVEY <br />ASSOCIATES, INC. <br />BENCHMARK: BOLT OVER , MAIN OUTLET OF FIRE HYDRANT WITH PUNCH MARK. BOLT ELEVATION= 223.22. <br />VERTICAL DATUM =N.G.V.D. 1929. <br />3.) RELOCATION OF UTILITY POLES AND UNDERGROUND UTILITIES ARE THE RESPONSIBILITY OF THE CUSTODIAN <br />OF THE POLE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION ON UTILITY POLE RELOCATION. <br />4.) UTILITY LOCATIONS SHOWN ARE APPROXIMATE ONLY AND SHALL BE VERIFIED BY THE CONTRACTOR IN THE <br />FIELD. CALL "DIG SAFE 1 -888- 344 - 7233 ". THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION <br />ACTIVITIES NEAR UTILITY LOCATIONS WITH THE RESPECTIVE UTILITY REPRESENTATIVE. <br />5.) THE CONTRACTOR IS RESPONSIBLE FOR ANY DISRUPTION OF THE EXISTING UTILITY SERVICE CONNECTIONS, <br />INCLUDING, BUT NOT LIMITED TO WATER, ELECTRICITY, TELEPHONE, GAS, AND CABLE TELEVISION, RESULTING <br />FROM THE CONTRACTORS WORK. <br />6.) THE CONTRACTOR SHALL PLACE 6" OF LOAM AND SEED IN DISTURBED AREAS WHEREVER PAVEMENT IS <br />NOT INDICATED. <br />7.) THE CONTRACTOR SHALL RESET SIGNS, MAIL BOXES, FENCES, STONEWALLS AND ANY OTHER EXISTING SITE <br />IMPROVEMENTS AS DIRECTED BY THE OWNER AND THE ENGINEER. <br />8.) THE CONTRACTOR SHALL ROUND SIDE SLOPES TO MEET EXISTING GROUND AT LOCATIONS DESIGNATED BY <br />THE ENGINEER. SLOPES SHALL NOT EXCEED 2' HORIZONTAL TO 1" VERTICAL (21 MAX.). <br />9.) ALL UTILITY COVERS WITHIN THE PROJECT LIMITS SHALL BE ADJUSTED TO THE PROPER GRADES., UTILITY <br />COVERS INCLUDE BUT ARE NOT LIMITED TO, CATCH BASIN FRAMES, AND GRATES, MANHOLE FRAMES AND <br />COVERS, GATE VALVES COVERS, CURB STRIPS AND HAND HOLES. <br />10) SUBJECT PROPERTY IS LOCATED WITHIN THE RS ZONING DISTRICT. <br />,SHEET NO. <br />.D- A7oCRIPTION <br />1 <br />TITLE SHEET <br />2 <br />LOCUS CONTEXT MAP <br />E1 <br />EXISTING CONDITIONS PLAN <br />L1 <br />LAYOUT PLAN <br />G1 <br />SITE CONSTRUCTION AND GRADING PLAN <br />U 1 <br />UTILITY PLAN <br />P1 <br />ROADWAY PROFILE PLAN <br />D1 <br />DETAILS <br />I CERTIFY THAT NO NOTICE OF APPEAL WAS RECEIVED DURING <br />THE TWENTY DAYS NEXT AFTER RECEIPT AND RECORDING OF <br />NOTICE FROM THE PLANNING BOARD OF THE APPROVAL OF <br />THE WITHIN PLAN. <br />TOWN CLERK DATE <br />AfARpE7T ROA <br />g FARMCREST AVE <br />Nt70P AY <br />OCUS <br />r�?� <br />o� <br />0� <br />LOCUS: <br />NOT TO <br />SCALE, <br />COMMONWEALTH <br />ENGINEERING <br />I NC. <br />CIVIL ENGINEERS & LAND SURVEYORS <br />27.CAMBRIDGE STREET <br />SUITE 106 <br />BURLINGTON, MA 01803 <br />TEL (781) 229 -0411 <br />FAX (781) 229 -0520 <br />WWW. COMMONENG. COM <br />LTN OF Mgsf9 <br />DAVID N. °yG <br />ROMERO <br />o CIVIL <br />No. 38696 <br />DEFINITIVE <br />PLAN OF LAND <br />10 STEDMAN ROAD <br />IN <br />LEXINGTON <br />MASSACHUSETTS <br />MIDDLESEX, COUNTY <br />FEBRUARY 5, 2010 <br />APPLICANT /OWNER: <br />ALFRED L. CASELLA <br />P.O. BOX 66051 <br />AUBURNDALE, MASSACHUSETTS <br />REVISIONS: <br />NO. DATE DESCRIPTION <br />DESIGN /DRAWN: <br />ERN <br />CHECKED- <br />5N R <br />FILE PATH: H: /PROJ \200020.21,.. <br />DWG WORKINGDRAWINGS TITLE_SHEET.DWG <br />LAYOUT <br />SHEET: <br />TITLE <br />JOB NO.: <br />U <br />z <br />z <br />Z <br />W <br />W <br />z <br />z <br />J <br />Q <br />z <br />z <br />0 <br />0 <br />0 <br />U <br />m <br />0 <br />0 <br />N <br />r <br />U <br />