Laserfiche WebLink
s <br />r� 'y <br />PA!R!K;N0 <br />L07 <br />WA <br />FOUN 7AIN <br />Is'i 11 14! __ <br />A TE N <br />7, <br />K <br />f ENTRANCTS <br />mmW11111), <br />)82, �2 <br />1 ! 'ICIOR EU_VAT!ECAj <br />'! 16�e ANlf ES 28c, 28� w Ll <br />4� CONCRETE PAVERS 35- <br />GBONE PATTERN 6ML <br />604 <br />14�) HERRING <br />I 'h r6 <br />7 BRICK � K PAVI PATTERN AT FLUSH GRANITE CURB <br />XR N/F 12 37662 <br />14 BENCH .,A,ND'- CHAIR SEATING <br />—00 <br />Water, <br />REELECI WmIj." <br />e 'Ef 4 <br />T[ =RMOPL 701 <br />�TTERNI <br />�4 A --WITH BAND NCRFT�7 nA I> 1 ASTICY <br />pj I I 7�� 1/�, - I . <br />12 Q, TYP. <br />_; - -,.- 48M <br />,V I TREEWAY LEXPPESS ONLY SIGN <br />V <br />51.6' <br />an I <br />22 <br />;A <br />3r I <br />8MI MIR <br />BIT, C{1C. PAVEMENT ¢+ ' ,g _ — . _ s ,l < . ; �; WICK PAVERS ON <br />12 _T_ <br />1j, CONCRETE BASE <br />SAW 210STInfli <br />901 am <br />�:7:) GRANITE POSTS .E CHAINS 41ji 1 SQ�jA'��F <br />30) <br />2tm <br />Oa74 <br />87 L -4 -)b4 <br />X REFLECTORIZED VMTE LINE <br />7x 3H 2 <br />(THERMOPLASTIC) FOR PARKING- TYP TPA, ISM= <br />A <br />go <br />�06 EN11 ANCE7 <br />BRICK PAVING PATTERN AT Aral FEE V DEPTACLE 15 <br />I Ell <br />21, �71 lit, <br />4— <br />T 2,56,22 <br />0, <br />14 PATH INTERSECTION <br />EXISTING CURB' � <br />_o5,'7� <br />12ELOCATED PEDESTAL BOX <br />�Vgllf' Hy EXL91ING CURB <br />BENCHES E LIGHT K 6 SIM <br />STA 0+00 BASELINE *13' <br />STA 2+6452 BASELINE 'C' <br />0 20 50 100 <br />FEET <br />1 "= 20'-0" HORIZONTAL <br />CURVE DATA <br />Curve <br />Radius <br />Angle <br />Length <br />A <br />81.78' <br />128.9* <br />183-96' <br />EI <br />20.0' <br />8.00 <br />2.79' <br />C <br />40.0' <br />34.60 <br />24.14' <br />D <br />.78' <br />96.9 <br />155.40' <br />E <br />40.0' <br />81.30 <br />1 56.74' <br />F <br />40.0' <br />84.5- <br />1 59.0- <br />#L <br />1. All lines and dimensions are parallel or perpendicular to the lines from wbich <br />are measured unless oftowise indicated <br />2. All line and grade work per Drawings aid Specifications stiall be laid out by <br />Registered Civil Engineer • Surveyor engaged • the Contractor, <br />3. Temporary makers to locate construction layout •oselines A B, C Z D will <br />establistied prior to construction • ottiers, <br />4. Layout and location • all site elements stiall be awoved by the Engineer in <br />consultation wth Landscape Architect prior to actual construction • installatiom <br />i. Storage areas for Contractor's equipment aid materials stiall be on and Whin <br />limb of work as ftwn on the plans and cis approved by ttie Engineer. <br />f,. Contractor sti• ll verify all existing conditions h the field aid report any <br />discrepancies in the site uvey to the &Vnw. <br />EMERY PARK IN DEPOT SQUARE <br />STATE <br />FED. AID. PROD. NO. <br />FISCAL <br />SHEET <br />TOTAL <br />0 <br />YEAR <br />NO. <br />SHEETS <br />MASS. <br />STP OOOS(139)X <br />1998 <br />8 <br />22 <br />PROJECT FILE NO. 602353 <br />EMERY PARK / DEPOT SQUARE PLAN <br />Baseline 'C' <br />10r1 - .74TEAM <br />0 <br />IJIiiliNikCINNNIIEIIfiXIiNiICN <br />II® <br />. <br />