Laserfiche WebLink
3'-4- <br />NOT TO SCALE <br />ago 0 m <br />I VARIES <br />BRICK PAVERS <br />RUNNING BOND PATTERN WITH BAND <br />NOT TO SCALE <br />NOT TO SCALE <br />1*9121 mi, I • A • <br />a <br />I us I A IN 0 ps 9 A <br />NOT TO SCALE <br />JOINTS 1180 MAXIMUM; <br />CUT BRICKS ALONG <br />ALL RADII AS REQUIRE <br />JOINTS 118* MAXIMUM, <br />CUT BRICKS AND PAVERS <br />ALONG ALL RADII AS REQUIRED <br />PF POINT OF ORIGIW <br />— FOR DIAGONAL <br />PARK PAT14S <br />(PLAN DIAGRAMMATI! <br />— RUNNING BOND PAT' <br />BRICK EDGE DETAIL <br />JOINTS 1/8! MAXIMUM, <br />CUT BRICKS ALONG <br />ALL RADII AS REQUIRED <br />BRICK PAVING PATTERN AT PATH INTERSECTION <br />SCALE 1/2" - V-00 <br />12'-4' <br />LEXINGTON <br />EMERY PARK IN DEPOT SQUARE <br />STATE <br />FED. AID. PROJ, No <br />FISCAL <br />I <br />SHEET <br />TOTAL <br />YEAR <br />NO. <br />SHEETS <br />MASS. <br />STP OOOS(139)X <br />1 1998 <br />14 <br />22 <br />PROJECT FILE NO. 602353 <br />SITE DETAILS <br />BRICK PAVING PATTERN AT BENCH AND CHAIR SEATING <br />NOT TO SCALE <br />ell <br />