'6. }
<br />er
<br />✓ ^ ` �i "Ilk ;
<br />o ,
<br />I �
<br />smooth under hinge, hrpd
<br />32/ o Heavy hinges riveted to p/. and frame
<br />12x2 "bar , welded
<br />frame - Corners we /ded
<br />i
<br />Hole for pipe
<br />shown thus. ^ or riveted fo L
<br />DETAIL OF'
<br />! N Ci E
<br />0
<br />-4, ifn /e /ron Frame
<br />3/'" checfrerea steel p /ate,
<br />3 hinged at sldes and split
<br />\e: ;'' ' /•'`� � ; ti �\ rn the middle,. Gr.33
<br />3L Location of tan/f as 0.92
<br />�'�, :6'_0` Lori �� shown on Topoyrapfirc sj
<br />a x �aPlan dated Aag.25, 1933. Ole
<br />3 3ti
<br />• roe
<br />.SECTION :B
<br />�PProximafe location o{ / "anchors \ � �
<br />,
<br />Notes:
<br />,8 Std e� 0 The site has been partially cleaned to /edge by the fox rl.
<br />^ 21 of ook
<br />\ � � % g,3 � Contractor should visit site to determine excavation
<br />/pdti5 L ;to� ` y,o 3� % to be done.
<br />¢ ae p
<br />to be thorouyhly cleaned and ap loose led e
<br />r l
<br />�D Q�pk g
<br />removed.
<br />Location 'o{ stand r
<br />ppe has been morel t» the :.north
<br />1 _, _:.pPProhvrr�z;te✓ J'0' crud-- to _.
<br />k 33 3 the vast 6`©
<br />me
<br />®A,
<br />,A,�/ locaitron as shown on Topographical P /an of Pro posed
<br />Stand r e site of the T wn E p
<br />P? Engineering Dept
<br />\' h\ of rades so Al !ed e
<br />9 g (.ShaWn. 328,0) and location of
<br />existing water pipe and tank have been ` tafrQn .from
<br />the above plan.
<br />i 3
<br />Concrete base ' to have' 12 sides as shown.
<br />���\ �i� 3'30 Rr?chor ,bolts
<br />to be provided by Steel Tank Contractor:
<br />�' 330` Core shal/ be used in driving bolts 11771, /edge , not to
<br />— rn�ure threads on bolts.
<br />anchor rods to be grouted rni'o ledge after s !rt ends
<br />have been tightened by dr'rvmy. P
<br />Present Concrete Tank
<br />Ig "� Anchor Bolts .-� - �a
<br />furnished by Tank Con {r ` To of concrete Gr. ,330.92
<br />, -
<br />., -_ 3-¢ "� Pods continuous around'
<br />3" sleeves IW I° r.(ot each top, bent fo : y,,
<br />20'-6 radius orrd /apped 2 =6 "af breiks ii'"
<br />anchor bo!>`� farmshed by _4'' furnished b
<br />€ y >oundatron Gantracfor
<br />foundatmn Contractor. � . r, d r, o; _ _ . .
<br />If u u - _Where anchor bo! s are oo r
<br />77r¢ra sleeves are tc be _M. n. ,t- h; e t /on
<br />/ v Ito Approx. resent Gr, of excamtion APProx. led e ! far de th of cony e 9
<br />{, led with grout by the . �, n � P . ; ., 9 �, p te, foundgtron
<br />Iii i! x contractor
<br />FoNndafio fr c shall of ofi° heads
<br />� a n Con a for ��°-� 5,.
<br />fter- boftam ` rrn of } _ t :_�.1 ,Rods; 2 fo each I 0 anchor boll #hat of i; -split he ends, a rovrde Wed'es
<br />Tank n g �i :- 8 3 n extend le into solid I to make them t p 9
<br />is r place, �t N , ledge, furnished and sel by { on Contractor,' &Ilom . zr6 be 2,0.
<br />ht !n hales
<br />drilled Into Jed9
<br />8 6' Washers, tarnished .16 !!}d below surface :of and to to be not less than 3'0"
<br />by Tank Contracfor. d -!t o, ledge a o Jess Phan 3 0 °above: washer /ate of abo>e
<br />d - I or bolts. These rods to be located about �ff each l�rde
<br />.. _ ! � - o>` "anchor - bolts. {
<br />ECT ON A A
<br />_ LEXINGTON 5TAIVDPiPi=
<br />FOUNDATION PLAN
<br />IT
<br />T�
<br />AND
<br />NOTED. Ur ,•r 1'
<br />t. 7, 1934
<br />i SHEC
<br />"-
<br />775
<br />
|