|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2013-08-30-Ad hoc Townwide Facilities Master Planning Committee (Final Report of Committee)
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
DISSOLVED COMMITTEES
>
Ad hoc Townwide Facilities Master Planning Committee - TFMP
>
Reports
>
2013-08-30-Ad hoc Townwide Facilities Master Planning Committee (Final Report of Committee)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 4:03:12 PM
Creation date
4/4/2014 2:11:20 PM
Metadata
Fields
Template:
Archives
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRESULTS OF THE <br />PUBLIC MEETING <br />CRITERIA TO PRIORITIZE PROJECTS <br />Criteria Results from February 2 Workshop <br />• Safe and accessible facilities (practical) <br />• Successfully provide services as intended (is space correct, acoustics, etc ?) <br />• Lifecycle (maintenance) <br />• Benefits (what need is fulfilled, # people served, how well people served) <br />• Fairness (length of waiting for a group) <br />• Funding (total cost, timing, source of funds, phasing) <br />• Band aids (little fixes to postpone major $) <br />• Opportunity (ex. Scottish Rite) <br />• Bandwidth (ability of Town staff to execute) <br />• Equity <br />• Timing <br />• Quality of life (needs have changed, demographics) <br />• Adequacy of existing facility <br />• Funding (public /private partnership) <br />• Secondary service improvements <br />• Use of similar facilities <br />• Changing demographics (ages, income) <br />• Impact on operating budget <br />• Impacts on other facilities <br />• Swing space (feasibility) <br />• Limitation of space at existing facility <br />• Ability of state to contribute to project (funding) <br />• Ability to control current facility <br />• Ability to serve all people (people with disabilities included) <br />• Programs /rooms for Townspeople <br />• Shovel ready (short -term readiness) <br />TOWNWIDE FACILITIES MASTER PLANNING 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.