Laserfiche WebLink
MARIA HASTINGS SCHOOL <br />Description <br />The Maria Hastings School is a two -story building with the lower level below grade. <br />The configuration of the building and its proximity to the street make it difficult to <br />effectively build additions. The below -grade segments of the building has had water <br />infiltration, which has the potential to cause air- quality problems. <br />This school lags behind the other elementary schools because program expansion <br />has grossly outrun building capacity, and there has been significant deferred <br />maintenance. The modular classroom additions have outlived their useful life. The <br />School Committee intends to submit a Statement of Interest to the Massachusetts <br />School Building Authority (MSBA) in January 2014. The School Committee's <br />recommendation is to address the school as soon as it is practical to rebuild. In the <br />feasibility phase, consider options for alternate footprints, spaces and programs. The <br />property has the following characteristics: <br />MARIA HASTINGS SCHOOL <br />7 CROSBY ROAD <br />LOCATION: 7 Crosby Road <br />YEAR OPENED: 1955 <br />LOT SIZE: 14.3 acres <br />BUILDING SIZE: 50,400 + 9,453 modular SF <br />OWNER: Town of Lexington <br />ZONING: RS (One - Family Dwelling Residential <br />District) <br />CURRENT USE: Elementary School <br />BUILDING ASSESSED VALUE (FY13): $4.24 <br />million <br />LAND ASSESSED VALUE (FY13): $673,000 <br />TOTAL ASSESSED VALUE (FY13): $4.92 <br />million <br />Previous Analyses <br />The 2009 Lexington Public School PK -12 Master Plan prepared by Design <br />Partnership of Cambridge reviewed the space needs of the Town schools. At that <br />time, no improvements were recommended for Hastings School. The 2009 report <br />stated that the School Committee should continue to monitor enrollment to <br />determine what actions should be taken. <br />Recent Actions <br />According to an interview with Superintendent Paul Ash (2012), the school was slated <br />for closure due to an expectation that enrollment was likely to decrease. However, <br />30 LEXINGTON, MASSACHUSETTS <br />