2014-01-23Minutes <br />Prior to the Town’s decision to purchase 39 Marrett Road, The Cecil Group estimated a <br />cost of $9.5 million to renovate the buildingand another $2.3 million to build a half gym. <br />The $9.5 million was considered CPA-eligible. <br />The fall 2013 STM approved $3.16 million to implement a scope of work, identified as <br />Phase 1, to make that portion of the renovations that were essential for move-in. <br />In response to the Board of Selectmen’s recent decision to postpone Phase 2 for several <br />years,the Ad hoc Community Center Advisory Committee (CCAC) developed an improved <br />design for Phase 1. The biggest change involved enlarging a multi-purpose area, originally <br />designed for 80 people banquet-style and now designed for 100 people banquet-style. Mr. <br />Goddard speculated that something in the range of $1.0 to $1.5 million more will be needed <br />for Phase 1, which is now being called Phase 1A,but thenumber is not yet definite. Specific <br />costestimatesfor this change will be available within days, and it is expected that an article <br />th <br />for the identified amount will be brought to the March 24STM. <br />Because of the delay in Phase 2, there are additional renovations, such as increased <br />HVAC capacity, installation of a generator and some building envelope repairs that need to <br />be addressed but are not included in Phase 1A. It is anticipated that an article for design and <br />engineering for this work will be brought to the 2014 Annual Town Meeting. This is being <br />called Phase 1B. Construction money for Phase 1B will be requested at a future Town <br />Meeting. It is anticipated that Phase 1B will be CPA-eligible. <br />Reasons identified for opening the building before Phase 1B is implemented included the <br />needto move the Senior Center out of the Muzzey Building as soon as possible, the need for <br />Recreation Department storage space that will be lost when the Cary Memorial Building <br />renovations are started, and the importance of maintaining community enthusiasm. It was <br />also noted thatexperience using the Community Center can inform the final refinements. <br />Neither the additional funding for Phase 1A nor the funding that will be requested for <br />Phase 1B are expected to add to original $9.5 million estimate to fit out and upgrade the <br />building for use as a Community Center; rather, they are advancements of work that would <br />have had to be done later anyway. <br />Mr. Goddard also reported the following: <br />The CCAC is interested in adding a full gym and a multi-purpose room that seats250 <br />people during Phase 2. However, both the Fire and Police stations need to be addressed, <br />and the BoS wants to pursue public safety needs before addressing Phase 2. If either or both <br />of the existingpublic safety buildings were renovated, some of the work would be CPA- <br />eligible,but it is questionable whether that approach is advantageous.It may be more <br />effective to build new facilities. <br />Operating funds for the Community Centerare included in the DPF FY2015 budget <br />request. Neither Human Services nor Recreation increased their FY2015 operating budget <br />requestsfor this purpose. <br />Report to the Upcoming Annual and Special Town Meetings: <br />4.There was a brief <br />review of the table prepared by Mr. Parker to identify who will be working on which <br />th <br />componentsof the report. There will be additional discussion at the January 30meeting. It was <br />agreed thatMs. Garberg will invitemembers of the School Committee and School Department to <br />th <br />the January 30meetingto discuss the School Department budget. <br />3 <br /> <br />