|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2021-05-10-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2021
>
2021-05-10-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 3:21:26 PM
Creation date
6/7/2021 3:21:15 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phil Hamilton—Aye <br /> 8:46 PM <br /> ViewPoint Cloud Permit# CN0I-21-11, DEP#201-1219 <br /> Ecological Restoration Notice of Intent: 27 and 29 Constitution Road <br /> Applicant: Town of Lexington Department of Engineering <br /> Property Owners: Andreina Toro (27 Constitution Rd), Ricardo Fernandes (29 Constitution Rd) <br /> Project: Kiln Brook culvert daylighting. An existing 36" RCP drain pipe that discharges to Kiln <br /> Brook will be converted to an open stream channel, including a stone lined channel, native <br /> vegetation plantings, a vegetated retaining wall, and an 8'x4' box culvert. <br /> Previous Meeting Dates: 3/29/2021, 4/12/2021, 4/26/2021 <br /> Supplemental Documentation: <br /> — Letter(Response to DEP Comments); From: Environmental Partners; To: Lexington <br /> Conservation Commission; RE: Wetlands Protection Act: Notice of Intent, Ecological <br /> Restoration Project..; Date: 5/3/2021; <br /> Mr. Matthew Weisman, Lexington Engineering, confirmed that there are no further comments <br /> from the MassDEP as part of the review process. Mr. Erik Kelley, Environmental Partners, also <br /> confirmed that there are no outstanding issues from the supplemental information that was <br /> shared with the state. The project team is satisfied with the results of the downstream flow <br /> conditions and stated that the analysis was carried 300 feet downstream from the existing <br /> drainage outfall and does not go down to the detention pond on the golf course. The daylighted <br /> channel results in a significant decrease in flow velocity and an estimated 0.1 feet increase in <br /> flood depth downstream. <br /> On a motion by Mr. Langseth and seconded by Mr. Beuttell, the Commission voted 6-0 by roll <br /> call vote to close the hearing. <br /> Record of vote as follows: <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 8:53 PM <br /> On a motion by Ms. Ladd and seconded by Ms. Samuels, the Commission voted 6-0 by roll call <br /> vote to issue the Restoration Order of Conditions. <br /> Record of vote as follows: <br /> Kevin Beuttell—Aye <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.