Laserfiche WebLink
— There is a potential for the trees to fall on the house. The trees were planted 70 years ago <br /> according to the neighbor. <br /> — The trees in question are outside of the 100-foot buffer zone within the side yard setback <br /> so would need approval as part of the building permit review. <br /> — Trying to balance the usability of the backyard space with the preservation and <br /> enhancement of the buffer zone. <br /> — Can make sure the intent of the swales is conveyed during the pre-construction meeting <br /> Ms. Miriam Boucher and Mr. Robert Boucher, Abutter and Property owners of 252 Lincoln <br /> Street, spoke during the hearing. Ms. Boucher stated that she wants the trees to be replaced along <br /> the property line. Mr. Kirby responded that the current homeowner can accommodate replacing <br /> the Evergreen trees with a suitable alternative. Ms. Samuels stated that she would prefer the <br /> Applicant replace the 4 Evergreens with 8 Green Arborvitaes and this will be added as a <br /> condition. <br /> On a motion by Mr. Langseth and seconded by Ms. Samuels, the Commission voted 6-0 by roll <br /> call vote to close the hearing. <br /> Record of vote as follows: <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 8:35 PM <br /> Amendment to Order of Conditions: 6 Blinn Road <br /> ViewPoint Cloud Permit# AOOC-21-2, DEP4201-1126, BL41083 <br /> Applicant/Property Owner: Wesley Leighton <br /> Project: modify the foundation elevations and the design details and specifications of a <br /> previously approved subsurface infiltration chamber within the 100-foot Buffer Zone to <br /> Bordering Vegetated Wetlands <br /> Documentation Submitted.- <br /> - <br /> ubmitted:— Letter; From: George Dimakarakos, P.E., Stamski and McNary, Inc.; To: Lexington <br /> Conservation Commission; RE: 6 Blinn Road, DEP File 4201-1126; Date: 4/21/2021; <br /> — Amended Order of Conditions Plan in Lexington, Massachusetts; Prepared for: LC Group <br /> LLC; Prepared by: Stamski and McNary, Inc; Stamped and signed by: George <br /> Dimakarakos, PE Civil No. 41281; Date: 4/21/2021; <br /> — Proposed Drywell Hydrology Model; Date: 4/21/2021; <br /> Mr. George Dimakarakos, Project Engineer, presented before the Commission the proposal to <br /> modify the elevation of the previously approved infiltration system. The proposed system will <br /> have a slightly wider footprint and Lexington Engineering confirmed that it will function as the <br /> 7 <br />