|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2021-05-10-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2021
>
2021-05-10-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 3:21:26 PM
Creation date
6/7/2021 3:21:15 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On a motion by Mr. Langseth and seconded by Ms. Samuels, the Commission voted 6-0 by roll <br /> call vote to issue a Negative Determination with conditions. <br /> Record of vote as follows: <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 7:17 PM <br /> Notice of Intent: 1010 Waltham Street <br /> ViewPoint Cloud Permit# CNOI-21-15, DEP4201-1220 <br /> Applicant/Property Owner: Brookhaven at Lexington <br /> Project: installation of an irrigation well and ancillary utilities within the 100-foot Buffer Zone to <br /> Bordering Vegetated Wetlands <br /> Documentation Submitted.- <br /> - <br /> ubmitted:— Site Plan -Proposed Irrigation Well; Locus: Brookhaven at Lexington, 1010 Waltham <br /> Street; Prepared by: OHI Engineering Inc; Stamped and signed by: James Borrebach, PE <br /> Civil No. 34332; Date: 4/7/2021; <br /> — WPA Form 3: Notice oflntent application and attachments; Prepared by: OHI <br /> Engineering Inc; Prepared for Applicant/Property Owner: Brookhaven at Lexington; Date <br /> signed by Applicant and Representative: 4/19/2021; <br /> Ms. Dohan recused herself. <br /> Mr. James Borrebach, Project Engineering with OHI Engineering, Inc., presented before the <br /> Commission. The estimate for project completion is 1-2 weeks. Mr. Borrebach said that he does <br /> not have the specifications for the well pump and he also does not know the pumping rate of the <br /> existing well. Mr. Beuttell asked if there was any anticipated vegetation removal as part of the <br /> proposal and Mr. Borrebach responded that he does not expect any removal of vegetation, even <br /> though the well is located near an existing tree. <br /> Mr. Langseth stated that if there comes a need to have a discharge of water associated with a <br /> drilling technique, that there should be a silt sack surrounded by hay bales. Ms. Mullins <br /> responded that there is a standard condition regarding dewatering and providing specifications <br /> before the project starts. <br /> Ms. Samuels stated that drought tolerant planning should be a consideration of Brookhaven in <br /> the future. <br /> On a motion by Ms. Ladd and seconded by Mr. Langseth, the Commission voted 5-0 by roll call <br /> vote to close the hearing. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.