Laserfiche WebLink
2"C 4-#3/0 (120/208V) <br />& 1 " C, 4 #12 (120VAC CKTS), <br />1 #12 GND & 8 #14 (ALARMS) <br />NEW PUMP "T ^" <br />ENTRANCE TUBE (NOTE <br />EXISTING UG CONDUIT, <br />NEW 4 -300 KCMIL <br />EXISTING BECO u <br />TRANSFORMER <br />EXISTING BECO <br />HANDHOLE <br />NEW GROUND ROD- <br />H YD <br />GUARD RAIL <br />TE STAIRS <br />AILING <br />HAYDEN AVENUE <br />SITE PLAN <br />SCALE: 1"=8' <br />120/208V, 30, 6OH-Z SERVICE <br />FROM EXISTING BECO TRANSFORMER <br />EXISTING UG CONDUIT, <br />NEW 4 - #3/0 <br />3/4 "C, 1 #4 GN <br />METER <br />SOCKET <br />( <br />i <br />GROUND ROD i <br />i <br />i <br />i <br />i <br />i <br />RECEPTACLE <br />i <br />TELEMETRY <br />(NOTE 1) L j <br />1"C' 2 #12 (120 VAC) <br />1#12 GND & 8 #14 (ALARMS) <br />1 "C, TELEPHONE SERVICE-, <br />EXISTING UG CONDUIT <br />NEW TELEPHONE <br />SERVICE FROM <br />HANDHOLE <br />2 "C, 4 - #3/0 <br />TO PUMP STATION <br />CONTROL PANEL <br />1 4 #12 (120 VAC CKTS), <br />1 #12 GND & 8 #14 (ALARMS) <br />TO PUMP STATION CONTROL PANEL <br />SINGLE LINE DIAGRAM <br />N.T.S. <br />I <br />EXISTING PUMP STATION <br />TO BE ABANDONED <br />EXISTING UG CONDUITS, (5), <br />- REMOVE WIRES <br />SERVICE CABINET ON <br />EXISTING CONCRETE PAD <br />(NOTE 2) <br />I EXISTING UG CONDUIT <br />NEW TELEPHONE <br />SERVICE WIRES <br />EXISTING TELEPHONE <br />HANDHOLE <br />OUTFALL <br />STRUCTURE <br />3/4 "C, 1#4 GND <br />MAIN CIRCUIT <br />BREAKER <br />SERVICE CABINET <br />2 "C, 4 - #3/0 <br />SURGE <br />225 <br />200 <br />2 "C, 4 - #3/0 <br />i <br />( <br />i <br />( <br />i <br />i <br />i <br />i "C, 4 #3/0 & 1 # GND <br />MMINUAL <br />TRANSFER <br />SWITCH i <br />( <br />i <br />GENERATOR <br />RECEPTACLE <br />IV 3/4 "C 2 #12 <br />& 1#12 GND <br />NOTES: <br />1. NOTED TELEMETRY EQUIPMENT TO BE REMOVED FROM THE EXISTING STATION <br />AND INSTALLED UNDER DIVISION 16. MAKE ALL NECESSARY CONNECTIONS. <br />2. DISCONNECT AND REMOVE THE EXISTING SERVICE CABINET. FURNISH AND <br />INSTALL THE NEW SERVICE CABINET ON THE EXISTING CONCRETE PAD AS <br />SHOWN. EXTEND EXISTING UNDERGROUND ELECTRIC AND TELEPHONE SERVICE <br />CONDUITS TO EQUIPMENT SHOWN. MAKE NEW UNDERGROUND CONDUIT PENETRATIONS <br />INTO THE SERVICE CABINET END SHEET USING WATERTIGHT CONDUIT FITTINGS. <br />INSTALL THE METER SOCKET (NORTH END) AND THE GENERATOR RECEPTACLE (SOUTH <br />END) ON THE EXTERIOR OF THE CABINET END SHEETS USING NEOPRENE GASKETS <br />TO SEAL MOUNTING BOLT AND CONDUIT PENETRATIONS WATERTIGHT. <br />3. MAKE CONNECTIONS TO CONDUIT FITTINGS PROVIDED ON THE PUMP STATION <br />ENTRANCE TUBE AND EXTEND WIRES IN THE RISER CONDUITS PROVIDED IN THE <br />ENTRANCE TUBE BY THE STATION MANUFACTURER. MAKE ALL NECESSARY <br />CONNECTIONS AT THE PUMP STATION CONTROL PANEL. <br />4. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE REQUIREMENT TO MAINTAIN <br />SEWAGE PUMPING OPERATION AT ALL TIMES. SCHEDULE THE WORK TO MINIMIZE <br />THE FREQUENCY AND DURATION OF ELECTRICAL SYSTEM OUTAGES. <br />JUSTIN <br />L <br />MAGEE <br />No. 25695 <br />