Laserfiche WebLink
Will you be willing to attend regular or periodic meetings of the Town's Community <br />Farming Committee to provide operational updates? Are you prepared to work <br />closely with the Community Farming Committee ( "Committee "), which will be the <br />Town entity directly overseeing all farm operations? This coordination will include <br />having a representative attend Committee meetings, which may well be monthly <br />during at least the first year of farm operations, and in any case will be at a frequency <br />responsive to issues that may arise. <br />4. Please describe any capital improvements you plan for the farm over the life of the <br />lease. Do the terms of the lease present any obstacles to capital improvements that <br />you otherwise might plan to make? Please describe any long term capital plans for the <br />facility relative to buildings and equipment. <br />5. Are you prepared to provide the Committee with a single point of contact with respect <br />to all aspects of farm operations? <br />6. Are you prepared to include in the Operational /Site Plan specific limitations on the <br />scope of operations and activities at the farm? Although the draft lease included in the <br />RFP is unclear on the point, the final negotiated Operational /Site Plan is intended to <br />be an enforceable part of the lease. <br />7. How do you propose to deal with the fact that the existing access way (to the east of <br />the farm stand) encroaches significantly on the land of the private abutter (and the <br />existing Town -owned land here is not wide enough to accommodate this access)? <br />4 <br />