Laserfiche WebLink
5. Are you prepared to provide the Committee with a single point of contact with <br />respect to all aspects of farm operations? <br />6. Are you prepared to include in the Operational/ Site Plan specific limitations on <br />the scope of operations and activities at the farm? Although the draft lease <br />included in the RFP is unclear on the point, the final negotiated Operational/Site <br />Plan is intended to be an enforceable part of the lease. <br />7. How do you propose to deal with the fact that the existing access way (to the east <br />of the farm stand) encroaches significantly on the land of the private abutter <br />(and the existing Town -owned land here is not wide enough to accommodate this <br />access)? <br />