|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2013-04-11-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2010-2019
>
2013
>
2013-04-11-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 4:10:30 PM
Creation date
5/14/2013 8:56:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,S US Mop <br />pQ` 1 775 ` �(3 <br />APRIL II <br />� k /NG'V <br />indicated a plan to upgrade Hancock Street. Committee members urged that <br />priority be given to these improvements. <br />The meeting was adjourned. <br />Record of Discussions of Friends of Lexington Bikeways <br />1. Treasurer's Report: We had no significant expenditures or credits. We <br />approved an expenditure of $200 for the depot rental and urge Peggy to <br />take the funds from our grant. <br />2. Patriot's Day Plans: Bob Hausslein has constructed the boardwalk and <br />along with Don Grant will bring it to our starting point. Marita has signed up <br />15 participants who will either walk or ride. All should meet at 1:30. <br />3. Bikeway Cleanup Day (Saturday, May 11): Bob Hausslein will organize <br />sections and captains. <br />4. Bikeway Trail Count: We will do counts on Tuesday, May 7 and Sunday, <br />May 12. We will ask Margaret Stebbins to coordinate using a Doodle poll. <br />5. Garfield Street Access Project: Bob Hausslein is meeting a scout on <br />Friday, April 12 to explain the project and made suggestions. <br />6. Bikeway Steps to the Town Offices Project: Bob and Mike are meeting <br />with a scout on Sunday, April 14 to explain this project. The Conservation <br />Commission has approved the use of plaques on projects to give credit to <br />the makers. <br />7. Other Business: Bob Dangel said there is a perennial puddle at Season's <br />Four. Perhaps this will be solved when the bikeway is repaved. <br />Upcoming Dates <br />• LBAC /FoLB meeting Thursday, May 9, at 7 PM, Room G15, Town <br />Office Building. <br />• Second Annual Massachusetts Trail Conference, Saturday, May 4, 8 <br />to 4 pm in Devens, MA. Hosted by the Massachusetts Recreational Trails <br />Advisory Board and DCR. <br />• Toole Design Group Open House: Recommendations for the <br />Minuteman Bikeway, Sunday, May 5, 1 — 4 pm, at the Lexington Depot <br />• Lexington Bike Walk `n Bus Week, Sunday through Saturday, May 5 to <br />11 <br />• Bikeway Cleanup Day: Saturday, May 11, 9 to 12 Noon <br />• Bikeway Trail Count Days: Tuesday, May 7, and Sunday, May 12. <br />Recorder: Marita Hartshorn <br />Editor: Peggy Enders <br />
The URL can be used to link to this page
Your browser does not support the video tag.