Laserfiche WebLink
6. To better serve the maintenance entrance and replace the one par <br />(it may be possible to pick up another one or two spaces), the D <br />be switched back to its current layout (headlights facing fence along rear lot line). This will also eliminate <br />the tandem parking setup. <br /> <br />The DAC is very concerned about the density of this site and views the above comments as minimum requirements that <br />should be met for this project to gain approval. If site lighting is proposed, a site lighting plan w/ photometrics and <br />fixture cut sheets shall be submitted for review and approval. A construction plan shall be submitted for final approval. <br /> <br /> <br />Lexington DPW <br />The DAC reviewed the latest building design and site plan for th <br />materials were also presented for review. There were no significant comments raised with respect to the building <br />and materials, except for concern about the durability of the me <br />thorough site design presentation was given as well. Comments r <br />expanding the bioretention areas specifically the Ðrain gardenÑ <br />bordered grass strips and edging along the building. The idea o <br />with a meadow or bioretention area was discussed to reduce the m <br />setting for this large facility. <br /> <br />Adjournment: <br />The meeting was adjourned at approximately 10:30PM. <br />Next Meeting: <br />Scheduled for Tuesday April 3 @ 7:30PM. <br />Cc: Board of Selectmen <br /> Wendy Manz, Planning Board Liaison <br />