|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-06-20-GCC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Greenways Corridor Committee-GCC
>
Minutes
>
2011-2019
>
2011
>
2011-06-20-GCC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 6:17:18 PM
Creation date
3/21/2013 4:11:59 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - GCC - Greenways Corridor Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Map Work update (Alex/Rick) <br />• Maps from Emily Schadler — comparison to Lincoln town Map — with marked trails <br />and markers /signs along trails. Maps — possible funding from historical and tourism <br />sources. Solicit favorite loops from multiple sources, i.e. Stewards, CLC, NEMBA, <br />LHS cross country coaches. <br />ACTION: Rick to draft request for descriptions of routes around town which connect <br />conservation and other open space areas, and handle distribution, collection and analysis <br />of inputs. <br />West Lexington Greenway Master Plan (Keith) <br />• Karen is actively working with VHB to complete the WLG Master Plan with 25% <br />design information by the first week in July. GCC will then need to prepare report <br />for CPC. <br />Drummer Boy /Grove Street trail connection (Alex) <br />• Alex has responded to the citizen request explaining the necessary steps and <br />estimated budget ($1750 +) for constructing the necessary boardwalk structure <br />required. The citizen does not sound interested at this point in actively pursuing this <br />issue. Eventual work to complete various phases of the proposed West Lexington <br />Greenway will incorporate this proposed trail connection. <br />3. Old Business: <br />Minuteman Connector site walk discussion. Discussion of the two basic design models, i.e. an <br />all season hard surface connection similar to the Minuteman Commuter Bikeway (Plan A) vs. a <br />three season hiking /mountain bike type trail (Plan B). Time did not permit reaching a <br />conclusion of which model to support. Discussion will be placed first on the agenda of the July <br />meeting. CPC funding for possible walking trail (Plan B) would need to be submitted this fall <br />(October/November) <br />Next Meetings: July 18, no August meeting, resume monthly meetings in September. <br />Respectfully submitted, <br />Paul Knight, Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.