|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-09-19-GCC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Greenways Corridor Committee-GCC
>
Minutes
>
2011-2019
>
2011
>
2011-09-19-GCC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 6:17:18 PM
Creation date
3/21/2013 4:06:49 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - GCC - Greenways Corridor Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Katandin Woods- Tophet Swamp connector trail planning : <br />• Richard Canale: Connecting Minuteman Bikeway to Bruce Freeman trail in Concord /Acton <br />Scenic Byway grant proposal was not successful. A Springfield proposal for bikeway design was <br />awarded. Might mean we could get SB funds in future, though the future of theScenic Byway <br />committee, and thus funding, is unclear. <br />• If decision is to not build an accessible path, then it may not qualify for funding from state or <br />federal sources. <br />• Discussion of potential accessibility, or lack thereof, at Wood St. end of Katandin Woods <br />segment of trail. May have multiple switchbacks on trail and /or alternate access from <br />Conestoga ? /Holton ?/Patterson? Road. <br />• Need to look into ADA/Architectural Board waivers. What accommodations are necessary for <br />trails? <br />• Action Item — Stew/Keith? — check into waiver process <br />Lincoln Lab grant request (Jay Sklar): no update <br />Lexington 300 Committee plans (Rick): <br />• There will be a planning meeting for Lexington 300 next week (9/26). Preliminary calendar of <br />events for the celebration exists. By general agreement, Rick will submit form for GCC walks as part <br />of celebration. <br />• Action Item — Rick — will turn in activity form <br />Lexington practice on trails @ cemeteries (Stew): no update <br />Report for CPC on WLG (Stew): <br />• Too late to apply for CPC funds this year; will apply for next cycle. <br />• In the meantime, will consider areas along WLG for interpretive signage — local history, <br />natural history, etc. <br />GCC meeting time: <br />• Changing meeting time to Friday morning — 8:OOam third Friday <br />4. New Business: <br />Trail maintenance — <br />• Question regarding work by Stewards or individuals who are not Town employees on town <br />land beyond conservation land, and on bikeway. <br />• Deb will talk with Dave Pinsonneault to see if there is any issue with trail maintenance <br />activities in such areas. <br />• Action Item — Deb — consult Dave Pinsonneault on town property work <br />• Stew discussed additional GCC members. Eileen Entin will submit application. <br />• Bob: procedure for creating trails on paper roads? — Pelham <br />• Stew: North St. conservation — need survey — question of how to fund it. <br />Next meeting — Friday, October 21, 8:00 AM. Note new time. <br />Meeting closed 5:50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.