Laserfiche WebLink
APPROPRIATION COMMITTEE REPORT TO NOVEMBER 2011 STM <br /> Warrant Article Analysis and Recommendations <br /> Article 2: Appropriate for Bridge Funds Funding Committee <br /> Requested Source Recommendation <br /> and Bowman Schools <br /> Reconstruction $21,670,000 Excluded Debt Approve (9-0) <br /> Background <br /> In 2006 and 2009 and in earlier years, the Lexington Public Schools adopted strategic facility master <br /> plans to guide the process of renovating current facilities and building new facilities. The objective of <br /> each plan was to ensure that the facilities adequately support the School System's educational program <br /> goals. <br /> The 2009 Facility Master Plan identified the Bridge and Bowman Elementary Schools, among others, as <br /> buildings that require significant capital investment. The Bridge and Bowman buildings are 45 and 44 <br /> years old, respectively. Many of the building systems have not been updated since the original construc- <br /> tion. Evaluation during the master planning found that the basic structures of the two buildings are for the <br /> most part sound, and that there is no need to replace them. However, the roof of the Bowman School and <br /> the HVAC and other mechanical systems of both schools are at or beyond their useful lives and it was <br /> recommended that they be replaced to maintain the schools in a condition suitable for education. <br /> The School Committee followed up on the Master Plan in 2010 by requesting that design funds be appro- <br /> priated, and that the Department of Public Facilities and the Permanent Building Committee support the <br /> development of detailed plans, for the renovation of Bridge and Bowman. At the 2010 Annual Town <br /> Meeting, $750,000 in Design and Engineering (D&E) monies was appropriated to plan for renovations <br /> that would extend the useful lives of the buildings by about 10 years. This plan, called the "base scope," <br /> covers a new roof for Bowman, and new windows, HVAC systems, boilers, and hardware for handi- <br /> capped accessibility in both buildings. <br /> Later in 2010, the School Committee voted to enlarge the scope of the renovation plans for Bridge and <br /> Bowman to extend the useful lives of the buildings for 20 to 25 years, rather than just 10 years, and to <br /> address overcrowding concerns.' The enlarged scope includes all the items in the "base scope" and adds: <br /> the installation of sprinklers; floor plan changes to address security and administrative needs; upgraded <br /> plans for HVAC and lighting systems; the conversion of existing spaces to classrooms (four in each <br /> building); and new small-group instructional spaces in each school. The 2011 Annual Town Meeting ap- <br /> propriated$280,000 to augment the previously appropriated D&E monies so that the design could address <br /> the enlarged scope. <br /> The design process has proceeded, and the School Committee is now requesting appropriation of the <br /> funds necessary to carry out the project. As of the time of writing, the total estimated project cost is ap- <br /> proximately $22,639,000. This total includes contingencies, i.e., amounts to cover cost increases in case <br /> the bids received or the actual costs of construction exceed the best present estimates. It also includes the <br /> $1,030,000 previously appropriated for D&E costs. This article requests an appropriation of$21,670,000, <br /> the difference of the total estimated cost less the prior appropriation, rounded up for purposes of borrow- <br /> ing. The appropriation will be contingent upon the passage of a debt exclusion override referendum to be <br /> held in January 2012. Details of the project financing are described below. <br /> 'As of August 31,2011,Bowman had 517 students and Bridge had 513 students enrolled. Each school has 24 <br /> classrooms. Currently the schools are over their designed capacity,and teachers'rooms and closets have been <br /> converted for use as programmatic spaces. <br /> Page 6 <br />