|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-11-13 CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2012
>
2012-11-13 CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:15:57 PM
Creation date
2/13/2013 10:01:22 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Routine maintenance and repair of existing drainage structures and <br />roadway embankment at select locations along Route 2 and associated on- <br />ramps and off-ramps within the Bordering Vegetated Wetland, Land <br />Under Waterbodies and Waterways, Bordering Land Subject to Flooding, <br />and Riverfront Area <br /> Documentation: NOI Application and Proposed Work Area Figures <br /> Present for the Applicant: Sean Hale: Epsilon Associates, Inc. and <br /> Andrea Norton: MassDOT <br /> <br /> Mr. Hale proposed 15 locations for road drainage maintenance, removing <br />debris, sediments, and garbage, etc; 14 of which are limited projects and <br />one (location 9) that is in the Buffer Zone only. He stated that the work <br />will be done by a mini excavator and hand tools. <br /> <br /> Comments from the Commission as follows: <br /> Ms. Miller read the engineering report. Mr. Langseth asked how work is <br />addressed in flowing water. Mr. Bitsko commented that the water on one <br />site flows to the Cambridge Reservoir and suggested that the Cambridge <br />Water Department be informed. <br /> <br /> Motion made and seconded to continue the hearing to November 27, 2012 <br />at 7:30 pm at the request of the applicant, 6-0 in favor. <br /> <br />10:00 pm Hearing – NOI, 13 Sherburne Road <br /> DEP# 201-880, BL 838 <br /> Construction of a single-family dwelling within the 100-foot Buffer Zone <br /> Documentation: NOI Application <br />Present for the Applicant: Ben Osgood: Pennoni Associates, Inc. <br /> <br /> Mr. Osgood proposed demolition and construction of a single-family <br />dwelling. <br /> <br /> Comments from the Commission as follows: <br />Mr. Langseth suggested a driveway trench detail that will signal to the <br />owner that it is clogged, instead of letting the water flow out to the street. <br />Mr. Kennedy commented that an opportunity could be made to plant <br />native species that would act as a boundary for the 25-foot Buffer Zone. <br />Ms. Miller read the engineering report. Mr. Langseth stated that a trench <br />drain should be added to the OM report and trees that are to be removed <br />should be labeled on the plan. <br /> <br />Carol Murphy of 14 Sherburne Road commented that there is a high water <br />table in the area and mature trees near the driveway of 13 Sherburne Road <br />should not be removed. Ms. Murphy asked for an explanation of an <br />infiltration system. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.