Laserfiche WebLink
Design Guidelines — Trail Types: A range of trail surface types were suggested specific to <br />various locations ranging from highly developed twelve -foot wide paved trails to natural <br />surface recreational trails. <br />• 25% Design Phase completed for the portion of the proposed Minuteman Connector from <br />the Minuteman Commuter Bikeway to Wood Street only, due to the inability of the Town <br />to reach an agreement with the private property owner of the parcel south of Wood Street <br />extending to the Minuteman National Historical Park. <br />It has been suggested by the Town Manager that a copy of the mapping data from this Master <br />Plan and 25% Design Phase documents be filed with the Department of Public Works for <br />incorporation with Town GIS information, in addition to copies retained by Conservation and <br />Recreation. <br />The Greenways Corridor Committee wishes to thank the Town for funding this Master Plan <br />document and proposes returning to the Board of Selectmen at a future point in time with a <br />prioritized list of recommendations for implementing various elements of this Master Plan. The <br />Greenways Corridor Committee remains dedicated to the task of identifying, planning and <br />recommending the implementation of non - vehicular access corridors for the public where <br />appropriate to Lexington's open space assets. <br />Keith Ohmart <br />Chair, Greenways Corridor Committee <br />cc: Community Preservation Committee <br />Capital Expenditures Committee <br />Conservation Division <br />Conservation Commission <br />Recreation Department <br />Recreation Committee <br />Planning Board <br />Bicycle Advisory Committee <br />Department of Public Works <br />