|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-10-11-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010-2019
>
2012
>
2012-10-11-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:11 PM
Creation date
1/15/2013 8:48:51 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lexington Permanent Building Committee 11 October 2012 <br />7.53 Construction Testing <br />9/27/12 <br />Collaborative Partners obtain unit pricing from several firms for Construction & Materials testing. The "low bidder" was deemed to <br />be UTS Testing of Stoneham. CP recommended approval of award to UTS Testing. <br />Motion to approve the recommendation of Collaborative Partners for award of the required Construction Testing Firm, UTS <br />Testing in the N. T. E amount of $50,000.00 to be invoiced T &M / Unit pricing per proposal. <br />Motion Jon 2nd Joe Vote 6 -0 -0 <br />7.54 Structural Peer Review <br />9/27/12 <br />Collaborative Partners obtained pricing from several firms for the required Structural Peer Review. The "low bidder" was deemed <br />to be DM Berg Engineering. CID recommended approval of award to DM Berg Engineering. <br />Motion to approve the recommendation of Collaborative Partners for award of the required Structural Peer Review, to DM Berg <br />Consultants in the amount of $3,600.00. <br />Motion Chuck 2nd Joe Vote 6 -0 -0 <br />7.55 Ground Breaking <br />9/27/12 <br />Ground Breaking ceremony planned for 10 am on 10/18/12. DPF asked if anyone from PBC wished to speak. None volunteered. It <br />was suggested that parking will be at a premium so car pooling is suggested. <br />7.56 Budget Update <br />9/27/12 <br />Shawmut reports that current estimates ($33,825,200) are approx. 2.6 million over current budget. <br />A Plan for getting project back to budget was presented and discussed. <br />A list of VE items was included in the presentation which was reviewed It was decided to have a working group meeting with projct <br />representative and PBC and School Comm. Representatives to review VE list. <br />7.57 Steel & Concrete Package <br />9/27/12 <br />Shawmut requested approval of the steel & Concrete package that was recently bid. <br />4 steel bidders and 3 concrete bidders responded. Copies of responses distributed. <br />Cost of steel work was $513,474 dollars over budget and Concrete was $54,204 dollars over budget. <br />Concrete increase is attributed to 16 inch foundation walls actual over 12 inch walls assumed at time of budget development as <br />well as costs of rebar, along with routine cost fluctuations. <br />Steel costs attributed to increases in erection costs over what was assumed in budget, as well as an increase in number of steel <br />pieces 467 (extra pieces) even though overall tonnage was down. <br />Overall cost of steel package $5271,922. <br />Shawmut does not see any gains to be made in VE process on steel and concrete, in actuality a delay may cause further increased <br />costs. <br />Motion to approve the recommendation of Collaborative Partners and Shawmut for award of the required Steel and Concrete <br />package in the amount of $5,271,922 for the Estabrook School Project. <br />Motion Eric 2nd Chuck Vote 6 -0 -0 <br />7.58 VE Meeting <br />9/27/12 <br />Monday (10/1/12) working group meeting to be focused on VE review for Budget control. DPF to coordinate with School <br />representatives. <br />7.59 Excavation <br />9/27/12 <br />Excavation was started and approx. 4 trucks per day are transporting soil to Hartwell Ave for top soil removal. Tree removal and <br />retaining wall complete. <br />Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.