|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-03-20 CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2012
>
2012-03-20 CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:15:56 PM
Creation date
1/4/2013 3:22:37 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Preliminary Site Development Use Plan Set – March 14, 2012, <br />Gary Larson, Uniterra Consulting. <br /> <br /> <br />Site Analysis Plan <br /> <br /> <br />Site Construction Plan <br /> <br /> <br />Utilities Plan <br /> <br /> <br />Landscape and Snow Storage Plan <br /> <br /> <br />Site Lighting Plan <br /> <br /> <br />Drainage Construction Details <br /> <br /> <br />Construction Details <br /> <br /> <br />Erosion and Sedimentation Control Plan <br /> <br />Additional Information – Invasive Plant Management Plan, Inn at <br />Hastings Park, 2027 and 2013 Massachusetts Avenue – March 14, <br />2012, Scott Smyers, Oxbow Associates <br /> <br />Stormwater Analysis and Report – Inn at Hastings Park, 2027- <br />2013 Massachusetts Avenue, Lexington, MA – March 14, 2012, <br />Uniterra Consulting. <br /> <br />Mr. Larson presented a revised site plan for the project. <br /> <br />Mr. Juhasz spoke about stormwater management, erosion and sediment <br />control, and the operations and maintenance plan for the property. He also <br />responded to comments presented in the peer review about the revised <br />drainage calculations. <br /> <br />Ms. Miller read the peer review report conducted by David Nyman of <br />Comprehensive Environmental, Inc. into the record. Mr. Juhasz responded <br />to Mr. Nyman’s report. <br /> <br />Ms. Miller read a report from John Livsey, Town of Lexington Engineer, <br />into the record. <br /> <br />Mr. Smyers responded to concerns that the Commission had at the last <br />meeting, including the 50 foot buffer zone and invasive plant control. <br /> <br />Mr. Nyman responded to the comments that Mr. Hamas had regarding his <br />report <br /> <br />The Commission discussed the project. Mr. Kennedy asked for a response <br />to comment 3. Mr. Langseth asked for more details on the snow <br />management plan. Mr. Langseth stated that this new plan seems to meet <br />the performance standards for the Wetlands Protection Act and the bylaw. <br />Mr. Kennedy asked about the added deck, the parking spaces, and soil <br />compression impacting trees during construction. Mr. Wolk asked about <br />tree health. <br /> <br />Ms. Miller took comments from the audience. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.