|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-11-26-GCC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Greenways Corridor Committee-GCC
>
Minutes
>
2011-2019
>
2012
>
2012-11-26-GCC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 6:17:34 PM
Creation date
12/20/2012 10:26:57 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - GCC - Greenways Corridor Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2013 meeting schedule — will continue to meet on the 4 th Monday of each month <br />(unless that falls on a holiday). <br />• Trail Easement Tracking proposal (Keith) — a way is needed to keep tabs on trails <br />and easements negotiated with developers. GCC can work with Planning Board. <br />A database exists in the Conservation Dept. for Conservation Restrictions and <br />easements — perhaps we can produce something similar. Should work with Aaron <br />Henry. <br />• Collaboration with Bicycle Advisory Committee (Peggy) — GCC should work <br />with BAC and Recreation on a guide for safe walking /biking routes. <br />Action Items: <br />Spreadsheet for tracking Easements — Stew, Eileen <br />West Lexington Greenway Executive Summary — Keith, Rick, Peggy, Stew <br />Next Steps for ACROSS route planning — Rick to coordinate <br />Future Agenda Items: <br />• Handicap accessibility for trails <br />• Bike/Walk Week <br />Next Meeting: December 17, 4:30 -6 pm, Legion Room, Cary Hall <br />Respectfully Submitted, <br />Alexandra Dohan, Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.