Lexington Permanent Building Committee <br />7.0 Estabrook Elementary <br />14 June 2012 <br />7.11 CM at Risk Selection <br />1/5/12 <br />Need Sub - Committee for CM @Risk selection which needs 2 members of PBC. PBC would like to know scheduling commitment <br />needed for this sub - committee and to have this at next meeting. <br />1/19/12 <br />Two or three meetings required along with submittal review. PBC discussed that Phil and Peter might be best candidates however <br />each needs to confirm if they could be considered eligible to serve in this capacity. <br />1/26/12 <br />Peter can not participate on Sub Committee, Phil will know next week. Chuck Favazzo and Joe McWeeney are able to participate. <br />3/22/12 <br />Joe Riley outlined results of CM @Risk interviews. Three firms prequalified and 1 later withdrew due to scheduling and commitment <br />charges. <br />Rationale was discussed for CM at Risk Subcommittee recommendation for Shawmut over CTA. <br />Motion to accept the recommendation of the CM @Risk subcommittee to rank the CM @Risk firms; Shawmut 1 and CTA 2 and enter <br />into negotiations with Shawmut. <br />Motion: Phil Coleman 2 nd : Chuck Favazzo Vote: 5 -0 Unanimous <br />PBC agreed that Joe Reilly of Walsh and Pat Goddard would initiate discussions with Shawmut and report back at next PBC meeting. <br />3/29/12 <br />Collaborative Partners (CP) reported back on fee negotiations with Shawmut and reviewed same with PBC. Included in <br />conversation is level of staffing of Shawmut with personnel on site and management of the project. Proposal from Shawmut is <br />currently proposed in excess of budgeted amount on MSBA 3011 form. <br />Much discussion on cost for CM at Risk services and pro's and cons of Shawmut approach and staffing plan. <br />Motion: <br />Motion to negotiate Shawmut proposal down $200,000 further than current proposal without removing additional key staff, to <br />support award of contract to Shawmut. <br />Motion: Eric Second: Dick Vote: 7 -0 <br />4/12/12 <br />CP reported that continued negotiations took place and Shawmut had agreed to the further fee reductions and that contract <br />language of a few items was being reviewed and would be made available for PBC consideration and award. <br />5/10/12 <br />Contingency language has been resolved with pre approval to come from Pat Goddard. Overall Contract language for CM at risk <br />agreement in to Town Counsel for his input and he will address the beginning of next week. <br />5/31/12 <br />Discussed Shawmut contract. All agree to move forward with Site Enabling work as planned, but no further work until reconciliation <br />of total project cost is completed. <br />Motion to proceed with GMP #1 not to exceed $650,000 to be defined in Amendment #1 to the contract with Shawmut Design & <br />Construction. <br />Motion: Phil Coleman 2 nd : Peter Johnson Vote: 7 -0 <br />7.16 Mosaic <br />12/1/11 <br />There has been discussion about saving the Estabrook logo mosaic, so the construction of the mosaic is being tested for <br />contaminants during December break. <br />3/8/12 <br />No asbestos was found in the wall. Options are to replicate on a mural or move existing to new school. <br />6/14/12 <br />Whereas an architectural appropriate location or process has not been found yet for the relocated mosaic so at this stage it's <br />relocation is not in the budget, therefore PBC recommends dropping the relocation evaluation process at this time with no funding <br />line in the budget for this work. <br />7.19 Contract bridge <br />Page 4 of 8 <br />