Laserfiche WebLink
<br />March 1, 2007 <br /> <br />There was general discussion of whether more detailed examination of SPED statistics, <br />including historical data predating the tracking tool, would yield better projections of <br />future costs. Alan commented that certainly it will be useful to obtain overall statistics <br />but it only takes the placement of a few students in expensive programs to have a large <br />impact on the budget. Tom continues to work on SPED records and said that he could use <br />some assistance. Alan Levine, Pam Hoffman and Mike Kennealy volunteered to help in <br />this effort. <br /> <br />There were suggestions for factors to review in the FY 2008 SPED cost projections. <br /> <br />Tom reported that Sen. Havern has mentioned that the State legislature may consider <br />legislation to reimburse towns for some portion of SPED transportation costs, which in <br />Lexington currently total about $1M per year. The SPED circuit breaker program does <br />not currently reimburse any transportation costs. <br /> <br />The current estimate for circuit breaker reimbursement in FY 2008 is now about <br />$2,069,000. This is lower than the number in the Superintendent’s recommended budget <br />book and does not anticipate either extraordinary relief from the state (available only if <br />special education costs exceed the prior year by more than 25%) or additional circuit <br />breaker reimbursement resulting from better accounting of in-house costs. The net <br />increase in SPED costs for FY 2008 after circuit breaker reimbursements will likely be <br />something over $1.5M. <br /> <br />Budget Summit 4. <br /> 3. At 7:25 the meeting moved to Cary Hall to participate in a <br />Budget Collaboration/Summit meeting. That meeting commenced at 7:40 PM. <br /> <br />The Board of Selectmen will publish minutes of the summit meeting. A few items are <br />worth noting here. First, the Governor’s proposed FY 2008 budget was released and <br />suggests that Lexington’s state aid may increase by something over $300K. Some $280K <br />of that increase is Chapter 70 aid, i.e., an increase of $50 per student, and $30K is in <br />lottery aid. The Town Manager is skeptical that the lottery aid will materialize, but may <br />consider building the increase in Chap. 70 aid into the Town’s budget. It could cover the <br />present gap between the amount in the recommended budget for Minuteman Science- <br />Tech. High School (about $1M) and the amount that Minuteman is now expected to <br />request ($1.236M). <br /> <br />The budget schedule was discussed. The operating budget will not be final until mid- <br />March at the earliest because the School Committee does not expect to vote on their <br />budget until March 13. Thus it will likely be useful to begin discussions of CPA and <br />non-General Fund enterprise capital requests at Town Meeting before the General Fund <br />articles are discussed. <br /> <br />Funding of the school capital requests was discussed. The need for estimates of cost <br />savings from energy efficiency improvements was highlighted. The possible use of some <br />of the funds presently planned to be put into the Stabilization Fund was mentioned. <br /> <br /> - 2 - <br /> <br />