Laserfiche WebLink
March 27, 2006 <br />a) Article 28c - the Selectmen are still asking for $150,000 of building <br />envelope money to remain unallocated and contingent on an override. <br />b) Article 28c – the $40,000 renovation to the Westview Cemetery building <br />includes about $13,000 to connect to the gas main and the balance to <br />completely replumb and replace the heating system and to repair the roof. <br />c) Article 28c – no plan exists for the Fire Station floor because the <br />engineering study still has to be completed. <br />d) The Unreserved Fund Balance (Free Cash) will be appropriated as <br />follows: <br /> Article 40 – Stabilization Fund $2 mil <br /> Article 34 – Harrington/Fiske $250K <br /> Article 17 – Operating Budget $2 mil <br /> Article 44 is unknown but should be $0 <br />e) Article 39 – Post Employment benefits (retiree health insurance trust) will <br />be indefinitely postponed. <br /> <br />The meeting was adjourned at 7:28 . <br />PM <br /> <br />Eric Michelson <br /> <br />Approved June 26, 2006 <br /> 2 <br />