|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-05-24-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010-2019
>
2012
>
2012-05-24-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:11 PM
Creation date
11/7/2012 1:29:46 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lexington Permanent Building Committee 24 May 2012 <br />• Meet with Hartwell Ave staff to talk about exporting site materials, environmental services and possibility importing <br />fill materials from Hartwell Ave. <br />• Shawmut working with Electric utility on temp power and new service issues. <br />5/24/12 <br />Much discussion on cost estimates. More reconciliation is needed and Shawmut to work with CP to get to final numbers to PBC. <br />7.37 DiNisco Update 5/10/12 <br />5/10/12 <br />DiNisco reviewed/ update Building Elevations and Interior Design features of classrooms, hallways, cafeteria, gym, acoustical <br />deck in gym and cafeteria and tectum panels in gym. Gym floor linoleum product. <br />Reviewed samples of gym floor products preference is for linoleum. Waiting for test data on bounce factors. Reviewed samples <br />of rubber and linoleum for hallway and classroom floors. Rubber in stairs and linoleum throughout building. Waiting for test <br />data for sound deadening. <br />Estimated 23% savings on energy but lowering gas prices are dropping our percentage savings to 19 % + / -. LEED requires 20% <br />minimum cost savings. Waterless urinals are being looked at for additional savings, which save 40,000 gallons of water per year <br />on 1.2 gal /flush. DiNisco working and confident in meeting LEED Silver. <br />Pat Goddard advised that ECC met recently and reviewed updated mechanical system information and energy analysis data from <br />RDK. The ECC requested additional information but supported that decisions made to date were appropriate. <br />DiNisco is working on Utility rebates with NSTAR and estimate $135,000; this is a work in progress. <br />Next working group meeting 5/21/12 <br />Next PBC meeting 5/24/12. <br />PTO Abutters Meeting 6/7/12 <br />Meeting Adjourned <br />Motion to Adjourn 5/24/12 10:30 PM <br />Motion: Dick Perry 2 Peter Johnson Unanimous <br />Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.