K -12 Master Plan <br />Lexington Public Schools <br />1. Executive Summary <br />This is the report of a PK -12 School Facilities Master Plan study conducted for the <br />Lexington Public Schools by Design Partnership of Cambridge between September 2008 <br />and January 2009. The purpose of this work is to provide a comprehensive set of <br />recommendations for school facilities looking 10 years into the future. These <br />recommendations are intended to incorporate previous recent facilities study work, <br />including the Design Partnership ES master plan study of 2006, the GGD High School <br />HVAC systems assessment of 2007 -08, and the 2008 Russo Bar roof assessment of all <br />school buildings. <br />The study and report are directed primarily to the 4 old elementary schools, the <br />Lexington High School, and the old Harrington School currently used for Central <br />Administration. As regards the elementary schools, the 2006 Master Plan study made <br />recommendations for the long term total renovation, replacement or closing of the 4 <br />older elementary schools. This report does not attempt to revisit that work except to <br />note and assess the impact of changes in projected ES enrollments between 2006 and <br />2008. <br />However, in light of the likelihood that it may be many years before funding is available <br />to replace or totally renovate one or more of the elementary schools, this report <br />identifies and prioritizes work that will need to be done for those older elementary <br />schools that remain in service up to 10 years into the future. The estimated total cost of <br />recommended scopes of work at 4 schools, undertaken according to the schedule put <br />forth in this report (construction in 2010 and 2011) is approximately $19.5 million. <br />As regards the Lexington High School, this report addresses two major categories of <br />work needing to be addressed. One category is physical building deficiencies either not <br />addressed by or that have occurred since the renovations completed in 2002. Major <br />work in these categories include roof and HVAC systems work. <br />The other major category of work is the need for additional space, resulting in part from <br />enrollment growth that has occurred beyond what was projected when renovations <br />were done, changes in space use and program needs, and from the fact that not all <br />recommended work was included in prior renovations. The cost of the work has been <br />calculated as if it would be undertaken as a single major capital project. A preliminary <br />estimate of this cost is approximately $37.7 million, calculated to June 2012, which is <br />the estimated mid -point of construction according to the proposed schedule. <br />The recommendation of this study is to proceed with projects that address the short - <br />term needs of the elementary schools and the long -term needs of the High School. <br />Costs, implementation strategy and time -frame are addressed. <br />Design Partnership of Eamhridga <br />