Laserfiche WebLink
<br /> <br /> <br /> <br />MEETING MINUTES <br /> <br /> <br />Committee Name: Bicycle Advisory Committee <br /> <br />Date, Time and Location of Meeting: <br />September 13, 2007; 7:00 pm; Rm 111 <br /> <br />Members Present: <br />Stew Kennedy (BAC chair), Harvey Bingham, Richard Canale <br />(Planning), Peg Enders, John Frey, Marita Hartshorn, Abe Shenker, Mike Tabaczynski, <br />Jerry VanHook <br />Others Present: <br /> Rich Spencer (FOLB), Wilma Bingham <br />Members Absent: <br />George Gagliardi, Hank Manz (Selectmen),Sandra Shaw <br />(Recreation) <br /> <br />Record of Votes taken and issues discussed. <br /> <br />Minutes <br /> from the August meeting were reviewed and approved as submitted. <br /> <br />Membership changes: <br /> Jim Wichmann’s resignation from the BAC was announced, and <br />deep appreciation was expressed for his years of service to the committee. Peg Enders <br />has been approved by the Selectmen to fill this spot on the BAC. The reappointments by <br />the Selectmen for new three-year terms for Abe, Mike and Stew were announced. <br /> <br />Bike Racks by the Depot Building: <br />John reported the rack to be placed under the Depot <br />awning was approved by the HDC. The HDC continued the hearing for the second rack <br />to their October 4 meeting, when the design is expected to be ready to be presented (by <br />David Williams.) We can now notify DPW that the first rack may be installed. <br /> <br />Hartwell Ave. / TMG / Sidewalk Committee report: <br /> Jerry brought the map / plan for <br />striping bike lanes on each side of Hartwell Ave that was presented by Engineering to the <br />Selectmen and approved by them. He will leave it in Room 111 for several days for <br />interested people to study it. The plan calls for painting to create two bike lanes, two <br />traffic lanes, and, where appropriate, a left turn lane – with accompanying signage. It is <br />expected the job will be contracted out this fall. Olga Guttag’s concern that sand and <br />debris in the bike lanes would be a problem was answered at the BoS meeting with the <br />assurance that DPW will keep it swept. It was noted that this will be considered an <br />experiment to be watched for a year and then reevaluated. <br /> <br />Sidewalk Committee activities: <br /> Jerry reported on plans to improve traffic flow and <br />safety during drop-off and pick-up at Hastings School, and about the experiment with <br />new bricks on the center sidewalk near the shoe store. <br /> <br /> <br />