Laserfiche WebLink
<br /> <br />SWC and TMG Report: <br />Jerry came from and reported on a concurrent public hearing <br />on sidewalks for Spring St and Hayden Ave. Shire Pharmaceuticals has agreed to fund <br />these, as part of their TDM efforts. The west side of Spring and the north side of Hayden <br />were chosen. An additional benefit of these new sidewalks will be opportunities for office <br />workers in the area to walk at lunchtime. It was agreed we should look into the possibility <br />of getting Patriot Partners to open up the old fire road through their property that <br />connects Spring St to Lincoln St. This would provide a key off-road connection of these <br />excellent walking areas. <br /> <br />Snowplowing the Bikeway in Arlington: <br /> Arlington has commenced a trial program of <br />plowing the Bikeway after snowstorms. To get a sense of the effect, Mike biked it on <br />Sunday, January 5 (and took photos to show us.) He found heavy usage by walkers and <br />people with strollers, but very few bikers. He saw hundreds of people out enjoying the <br />Bikeway. Stew learned that even with the six storms that required clearing in December, <br />Arlington had spent for the month only $1584 for plowing and sanding. He heard from <br />the Arlington Planning Office that public feedback has been generally favorable. Mike <br />observed that people seemed less conscious of path sharing than usual. And the shoulder <br />buildup after several plowings also suggests that our recommendation for plowing only <br />half the path (a sidewalk’s width) in Lexington may need to be reconsidered. We agreed <br />to wait until the end of this season to see what else Arlington learns from their <br />experimental program and then revisit our position on plowing. <br /> <br />North – South Bike Route <br />: Abe and Peg are interested in developing bike lanes in a <br />north - south direction between the Center and Concord Avenue and between the <br />Waltham line and the Burlington line. There is interest in the committee to take this on as <br />a future project. We should look at the proposed routes in the Comprehensive Plan as a <br />first step. <br /> <br />Environmental Bond Bill <br />: The LBAC voted unanimously to go on record in support of <br />the Environmental Bond bill currently before the state legislature. <br /> <br /> <br />Woburn Street crossing <br />: We looked at new optional designs for the Bikeway crossing <br />of Woburn St. that were provided by Engineering. Stew will feed our comments back to <br />Dave Cannon. Dave expects to hold a public hearing on Woburn St design changes later <br />this winter. <br /> <br />Meeting adjourned. <br /> <br /> <br />Record of Friends of Lexington Bikeways votes and discussions. <br /> <br />Treasurer’s Report <br />: Rich reported that the treasury now contains $2093.13. <br /> <br /> <br /> <br />