Laserfiche WebLink
<br />The committee talked about the prospect of federal funding for “shovel ready <br />projects” to mitigate the deteriorating conditions on the bikeway, including the <br />need for root barriers, new bollards, and a full repaving. Stew mentioned that he <br />and Peggy have an appointment to meet with the new town engineer, John <br />Livsey. <br /> <br />Fog Line/Bike Lane Subcommittee Update: <br /> The group reviewed the draft of a <br />proposed letter from LBAC recommending to the Selectmen the adoption of new <br />sideline striping standards on major town streets. Comments were offered, <br />including the importance of emphasizing safety in the first sentence, in <br />diminishing references to sidewalks, to being more emphatic. Laurel mentioned <br />that Arlington has a similar initiative underway. It was recommended that letters <br />of support be enlisted from the Friends and other committees and that this be an <br />agenda item for the Selectmen at an upcoming meeting. <br /> <br />Setting Priorities for the First Half of 2009 <br />: Peggy handed around a list of <br />suggested priorities for 2009 and asked for comments. After some discussion, <br />the group decided to focus in upcoming months on the following: <br />?? <br />Sidewalk plowing pilot <br />?? <br />Striping (recommendation, agenda for Selectmen, gather support) <br />?? <br />Improve safety and signage on the Minuteman Bikeway at Revere Street <br />?? <br />Bikeway reconstruction: paving, root barriers, bollards, drainage <br />problems <br />?? <br />Improving information on the LBAC website <br />?? <br />Develop community <br /> <br />The group talked about speaking at the early April Town Meeting, when the <br />budget is discussed, about LBAC priorities. <br /> <br />The LBAC meeting was adjourned at 8:35 pm. <br /> <br />Record of Friends of Lexington Bikeways Discussion <br />: <br /> <br />Treasurer’s Report: <br />Rich Spencer reported that FoLB received $770 in snow <br />plowing contributions since our December meeting, bringing the current balance <br />to $ 4,656.32. Abe mentioned that he has an additional $1,950 in donations that <br />have not been deposited and $150 more for the Charles Herlihy memorial. Abe <br />said he will send thank you notes to contributors, both for the plowing and toward <br />the memory of Charles Herlihy. He said that he doesn’t think more money will <br />be forthcoming from donors, since the results have not been good and our <br />arrangement costs four times more than plowing Arlington. We agreed that the <br />town managers – Bill Hadley, Dave Pinsonneault and Carl Valente – need to <br />know that “the Friends feel it can be done better.” <br /> <br /> <br />