|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2008-12-03-PB-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
2000-2009
>
2008
>
2008-12-03-PB-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 3:32:26 PM
Creation date
1/26/2009 3:08:33 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PB - Planning Board
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minutes for the Meeting of December 3, 2008 Page 3 <br /> <br />?? <br />Use LEED standards; <br />?? <br />Have a complete reconciliation of calipers for the trees; and <br />?? <br />Move on to the preliminary to show the ideas fully developed. <br />Mr. Henry said to remember to maintain the stonewalls, which were protected by MEPA. Ms. Manz said <br />she would like to preserve the features of the site, but in no way could the rural character be preserved <br />with 14 units at 7,200 square feet. Having gravel roads and no sidewalks would create a safety issue with <br />children, which was a more important issue. Mr. Zurlo asked the Board if they supported a <br />recommendation that the applicant proceed to the preliminary stage. Mr. Canale said to leave it to the <br />applicant. Mr. Galaitsis would prefer another sketch. Mr. Cataldo said the lotting for the site would <br />change with the roadway layout. He would speak with Meridian to determine the next step. <br /> <br />*************************************REZONING************************************* <br />Three Ledgemont, Rezoning: The Beal Companies came in for an informal update on the PSDUP being <br />drafted. Mr. Nichols said they were not here to show designs, only to update the Board. The Beal <br />Companies had met with the Conservation Commission last night and the public hearing was closed and <br />they are awaiting a decision on the trees and limit of work area to retain. They were working with the <br />Town on traffic mitigation regarding monies to fund at the beginning, performance based contributions, <br />Lexpress monies and traffic demand management measures. Mr. Nichols shared a copy of Design <br />Principles prepared in response to input from several Town constituencies and will continue to work on <br />implementing into their final PSDUP. <br /> <br />Mr. Zurlo asked when would the PSDUP be ready. Mr. Nichols said within two weeks. Mr. Zurlo asked <br />what other public meetings were scheduled regarding the PSDUP language. Mr. Nichols said they were <br />meeting on a regular basis to refine concepts and the PSDUP would be completed before the first public <br />hearing. <br /> <br />Ms. McKenna asked about the current thoughts in terms of building siting - would it be tucked behind or <br />in front of the knoll? Mr. Nichols said there were no plans yet. Ms. McKenna said the neighbors felt that <br />the garage should be eliminated and the building put behind the knoll with the short end towards the <br />neighbors. She said to keep in mind that building on Spring Street would detract from the award winning <br />site design. <br /> <br />**********************OPEN SPACE AND RECREATION PLAN*************************** <br />The Board members now have a copy of the open space and recreation plan update in hand to review it <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.