|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2008-07-16-PB-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
2000-2009
>
2008
>
2008-07-16-PB-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 3:32:26 PM
Creation date
1/6/2009 12:31:21 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PB - Planning Board
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minutes for the Meeting of July 16, 2008 Page 5 <br /> <br />***************************SUBDIVISION ADMINISTRATION*************************** <br />Grandview Avenue, Tri-Partite Agreement Reduction in Surety: Mr. Henry said Mr. David Burns, the <br />developer of the Grandview Subdivision, requested another reduction in surety based on the installation <br />of the drainage system, and pavement, and the completion of electric, telephone and cable work. <br />Engineering had done a review and he had gone to check the site himself and found the request <br />reasonable. <br /> <br />On a motion duly made and seconded, it was voted, 4-0, to grant a reduction in surety for $98, 926.00 for <br />the release of funds for the water and sewer installation work competed on Grandview Avenue. <br /> <br />************************************** STAFF REPORTS******************************* <br />Information on Models/Mockups: <br />Mr. Henry looked into the cost of photo mockups (digital photo) and a ballpark figure was approximately <br />$10,000. This could be used as an option to see what the proposed site might look like. <br />Mr. Zurlo said photomontage is somewhat different from a massing model. The photomontage is a fixed <br />vantage point rendering which is superimposed into a photograph. $5,000 may be the cost for the <br />rendering and would typically require a strong involvement of an architect. Mr. Zurlo continued, the <br />massing models allow for manipulation during the approval process but one would be able to see the <br />footprint and volume of the building within its context early on. For more complicated projects, the Board <br />should require them to do that at the preliminary stage. Mr. Hornig said now that there is some idea of <br />what cost was being added, the concern is with small site sensitive development and these types of <br />upfront costs. Mr. Henry said this could be put in the development regulations if the Board wanted to <br />require this. <br /> <br />******************************* BOARD MEMBER REPORTS**************************** <br />Ms. Manz said she attended the MAPC meeting in Framingham and had nothing to report because it was <br />taken up with concerns of Framingham town meeting members. Mr. Canale said he heard that the tenor of <br />the MAPC meeting in Arlington was very different from the Framingham meeting. <br /> <br />On a motion duly made and seconded, it was voted to adjourn the meeting at 9:12 p.m. <br /> <br /> <br /> <br />Wendy Manz, Clerk <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.