|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2005-06-09-ZBA-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Board of Appeals-ZBA
>
Minutes
>
2000-2009
>
2005
>
2005-06-09-ZBA-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 11:34:22 AM
Creation date
12/19/2007 10:12:20 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - ZBA - Zoning Board of Appeals
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minutes of the Lexington Zoning Board of Appeals June 9, 2005 <br /> Present: Chairman Judith J. Uhrig, Arthur C. Smith, Nyles N. Barnert, John J. McWeeney and Maura L. <br /> Sheehan <br /> Petition Address: Waltham Street, Map 5, Parcel 11A <br /> The Chairman opened the hearing at 8:17 pm by reading the legal notice and described information <br /> received from the Petitioner relative to the Petition. The Board received the following prior to the <br /> hearing: letter from the Conservation Commission dated June, 2005; letter for the Planning Board dated <br /> June, 2005; letter from the Design Advisory Committee dated June 2, 2005. <br /> Applicant submitted the following with the application for hearing: Definitive Site Development and <br /> Use Plan[ "DSDUP "]; Town Clerk's certified copy of Preliminary Site Development and Use <br /> Plan[" PSDUP"] approved by Town Meeting on March 30, 2005 under Article 9; letter to the Board of <br /> Appeals dated May 2, 2005 from Edmund C. Grant, attorney for the petitioner. <br /> The following were present at the hearing : Ernest Rogers of Rogers & Company, petitioner; attorney <br /> Edmund C. Grant; Michael Dryden of Meridian Engineering, RLA; architect Ed Nilsson of <br /> Nilsson +Siden Associates, Inc.; traffic consultant Charles Kalauskis of BSC Group. The presentation <br /> was made by Mr. Grant who stated that there had been no changes made in the DSDUP from the <br /> PSDUP approved by Town Meeting; <br /> Questions from the Board: <br /> Judy Uhrig: Is the list of conditions in the narrative? Answer: Yes, section 6, page 9 thru 10. <br /> Nyles Barnert: Is there a maintenance plan for conservation: Answer: Yes it is in the order of <br /> conditions. <br /> Nyles Barnert: Is there a connection between you and your neighbor McDonald's. Answer: They will <br /> provide walkway. <br /> Judy Uhrig: Is that written anywhere? Yes in the narrative. <br /> John McWeeney: What are the permitted uses? Answer: Bank use, drive up window, medical uses <br /> allowed, CLO. <br /> John McWeeney: Is the handicapped ramp flushed with sidewalk? Answer: We will extend sidewalk <br /> until the end. <br /> Arthur Smith: Are you coming back for special permit for sign? Answer: We are entitled to one sign <br /> on the building. <br /> John McWeeney: Traffic study? Answer: Does not include the large apartment complex; had checked <br /> with Lexington planning but not Waltham. John concerned with the back up at lights at peak traffic <br /> times. <br /> John McWeeney: Any improvements from next door planned? Answer: Hit some political snags. The <br /> planning board from Waltham turned down the curb cut. They are working with Waltham planning, the <br /> traffic committee and major to try to iron things out. <br />
The URL can be used to link to this page
Your browser does not support the video tag.